↩ NeuroDriftUA
NeuroDrift · AI · Briefing

The payback on AI infrastructure: about $740bn of capital expenditure a year, a token of the same quality 280 times cheaper, and whether multiples will compress to 10–12

The price of a model’s answer of the same quality has fallen hundreds of times in two years. One might think the world will need fewer data centres, and that the valuations of the companies building them must drop to the level of conservative industries. The data say otherwise: token consumption is growing faster than the price is falling, hardware is in short supply, and Nvidia’s multiple has already compressed because earnings grew faster than the share price. The forward P/E of the big four is 19–23, not 50–70. The real risk lies in cash flow: construction eats almost all of it, and the gap is increasingly covered by debt.

Capital expenditure of Microsoft, Alphabet, Amazon and Meta, 2026 plan
$725–760bn
the plan includes finance leases; in 2025 it was $376bn in cash, excluding them, and in 2015 $24bn
Share of operating cash flow eaten by capital expenditure, Q2 2026
97%
five companies including Oracle (its quarter runs March–May; excluding Oracle, 96%); in Q3 2024, 50%
Price of a million tokens of the cheapest GPT-3.5-level model
$20 → $0.07
280 times cheaper in 23 months (two different models); OpenAI’s flagship prices have risen since 2025, while Anthropic’s Opus has fallen in price threefold
Forward P/E of the big four, 26 October 2026
19–23
Nvidia is at 14–18 (depending on methodology), the S&P 500 at 19 (as of 16 October); not 50–70

In April–June 2026 Alphabet spent $44.9bn on servers and data centres, while its operating cash flow over the same three months was $39.1bn. Free cash flow turned negative: −$5.9bn 1 H. According to press reports, that had not happened since the company listed in 2004 L. In June, in the same quarter, Alphabet raised $49.6bn by issuing shares and mandatory convertible preferred stock to pay for construction 2 H. Earlier, the price of an AI model’s answer of the same quality had already fallen sharply: from November 2022 to October 2024, by more than 280 times 3 H. According to Epoch AI’s list, the cheapest GPT-3.5-level model cost $20 per million tokens in November 2022, and in October 2024 the cheapest model of the same level cost $0.07 4 M.

These two series underpin a popular hypothesis. If a machine’s answer gets hundreds of times cheaper, the world will need less capacity than is being built now. Companies that put hundreds of billions of dollars a year into data centres will then be left with surplus hardware, and their valuations will fall from the level of technology leaders to that of conservative industries: the price-to-earnings (P/E) ratio from 50–70 to 10–12. We tested this hypothesis against company reports, market data and the history of earlier infrastructure booms. It turned out to be half wrong: the problem is not where people look for it.

Cheaper tokens have not reduced the need for hardware: consumption is growing faster than the price is falling, chiefly because models have learned to do new things. The risk to the valuations of AI companies is different: construction already eats almost all of their cash flow and is shifting to debt, while the revenue of OpenAI and Anthropic equals only a tenth of the big four’s capital expenditure. The railway and fibre booms showed similar signs – debt financing and revenue lagging behind spending.

In brief

  • Scale. In 2025 Microsoft, Alphabet, Amazon and Meta spent $376bn on servers, equipment and buildings (capital expenditure), 65% more than a year earlier 5 M. Plans for 2026 are $725–760bn, and every report has raised them (the only cut, Microsoft’s in July, stems from a change in lease accounting) 6 M. That is about 2.3% of US GDP (our calculation) L.
  • Cash. In the latest reported quarter (for Oracle, March–May 2026) the capital expenditure of the five companies including Oracle equalled 97% of their operating cash flow (96% for the four companies excluding Oracle in April–June), against half in the third quarter of 2024 (our calculation from the reports) 5 M. Six companies, including Oracle and CoreWeave, disclosed leases of data centres and related facilities that were signed but not yet commenced, with $1.23trn of undiscounted payments (falling due on various dates in 2026); this sum should not be added to the spending plans 7 L.
  • Tokens. An answer of fixed quality gets cheaper by tens of times a year, but companies are moving to more expensive flagship models, and reasoning models and agents use several times more tokens per task. In two years Google increased its token processing about 330-fold (our calculation from company statements: about 9.7trn tokens a month in May 2024 and more than 3.2 quadrillion in May 2026) 8,9 L. Vacancy in the data centres of the main North American markets is at a record low of 1.4% 10 H.
  • Revenue. In the first half of 2026 OpenAI and Anthropic together took in $28.7bn of revenue (Anthropic $16.3bn according to its S-1 prospectus, on a gross basis; OpenAI $12.4bn according to an unconfirmed WSJ report, on a net basis) 11,12 M. That is about 10% of the big four’s cash capital expenditure over the same period ($294.8bn); in 2024 it was under 2% (our calculation) L. Anthropic’s revenue in the second quarter of 2026 was 14.7 times higher than a year earlier, but its costs are growing too 11 H.
  • Multiples. The forward P/E of Microsoft is 22.4, Alphabet 20.9, Meta 18.9, Nvidia 13.6 to 17.8 depending on methodology, and the S&P 500 19.0 13,14,15 M. Compression has already happened at Nvidia: its trailing P/E has fallen from 115 to 27 since January 2023, because earnings grew about 44-fold and market capitalisation 10-fold 16 L. Utilities trade at 16 times forward earnings and railways at 20–22; only the telecoms companies Verizon, AT&T and Comcast trade below 10 15,17 M.
  • History. British investors in the 1840s put about £250m into railways and lost roughly a third, but almost all the lines kept running 18 M. The wholesale price of IP transit in the US fell from $1,200 per Mbit/s a month in 1998 to $75 in 2005 (an informal DrPeering survey) 19 L; by another methodology, TeleGeography’s, the median in 2026 is $0.08 20 M. The main difference with AI: servers last 5–6 years, not decades like railway lines and fibre.
  • What next. We do not expect the P/E of the whole sector to fall to 10–12. The likelier split is between companies: those that build with their own money will hold their valuations, and those that build mainly on debt are already compressing. This is our estimate from two examples; so far there are few observations L. Oracle trades at a forward P/E of 11.5 and has lost about 57% of its market capitalisation from the peak (about 63% by share price); CoreWeave’s shares are about 70% below their peak 21,13 M. The first test is the capital expenditure guidance for 2027 in the reports of Microsoft (28 October), Amazon (29 October) and Alphabet (expected on 28 October).

01 · ScaleHow much is being built and with what money: $376bn in 2025, $725–760bn in 2026

In 2015 Microsoft, Alphabet, Amazon and Meta together spent $24bn on buildings, servers and networks. In 2025 they spent $376bn, 15 times as much 22,5 M. Two-thirds of that increase came in the past two years: spending rose by 55% in 2024 and by 65% in 2025. It fell only once in the decade, in 2023, when Meta and Amazon cut their budgets by 13% and 17% 22 M. There has been no such pause since 2023.

$376bncapital expenditure of the big four in 2025
+65%on 2024
$725–760bnplans for 2026
$295bnof cash spending in the first half of 2026 (excluding finance leases; including them, almost $305bn)
~2.3% of GDPof the US, on the 2026 plan (our calculation)

The plans for 2026 rose with every report. Alphabet promised $175–185bn in February, $180–190bn in April and $195–205bn in July. Meta began the year at $115–135bn and on 21 October narrowed the range to $135–145bn. Amazon raised its guidance from $200bn to $220bn 6,7 M. Microsoft named ~$190bn for calendar 2026 in April and ~$175bn in July. According to the company, its underlying expectations for spending did not change: it altered its accounting for data-centre leases, and part of the payments stopped appearing in the capital expenditure line 23,24 H. The ranges of the four companies add up to $725–745bn if Microsoft is taken at ~$175bn and to $740–760bn if at ~$190bn; together, $725–760bn. Oracle and CoreWeave are not included 6 L. Companies have more than once spent more than they promised: in 2025 Meta planned $60–65bn but spent $72.2bn including payments on finance leases ($69.7bn of cash purchases of equipment) 25 H.

The big four’s capital expenditure has grown 15-fold in 10 years
Purchases of buildings, servers and equipment in the calendar year, $bn; 2026 shows the midpoints of company guidance (lighter bars)
Sources: companies’ annual 10-K and quarterly 10-Q filings (SEC). Microsoft reports on a fiscal year ending in June; the data have been converted to calendar years. Amazon is gross purchases of equipment, including logistics. Guidance for 2026: Alphabet $195–205bn, Amazon ~$220bn, Microsoft ~$190bn on a comparable accounting basis (~$175bn after the change in lease accounting), Meta $135–145bn including payments on finance leases. The bases of the guidance are not entirely identical.

Part of the growth is prices, not capacity. According to Microsoft’s chief financial officer, about $25bn of the ~$190bn for 2026 is explained by dearer components 23 H. Amazon attributed the $20bn increase in its guidance to more expensive memory 6 M. TrendForce forecasts that contract prices of flash memory will rise by a further 15–20% quarter on quarter in the fourth quarter of 2026, and that memory suppliers are widening their price increases 26,27 H. So at least $45bn of the $725–760bn (about 6%) is dearer components, on the statements of Microsoft ($25bn) and Amazon (an increase of $20bn that the company attributed to more expensive memory); there is no breakdown for Alphabet and Meta (our estimate) L.

Construction has caught up with cash flow

Until 2024 the big four spent between a third and 55% of operating cash flow – the money that the core business brings in – on construction. The rest went on share buybacks, dividends and acquisitions. In 2025 the share rose to 65%, and over the 12 months to June 2026 to 77% 22 M. If Oracle (whose quarter runs March–May) is added, in the latest reported quarter the five companies spent $181.5bn on construction against operating cash flow of $186.4bn – 97.4% 5 M. Researchers at Epoch AI, who track these series, calculated in June that capital expenditure is growing by about 70% a year and cash flow by 23%. On that trend the two will cross at the end of 2026: Epoch itself names the third quarter, while in its table the excess begins in the fourth; depending on where the calculation window starts, it could be anywhere from the second to the fourth quarter. This is an extrapolation of a trend, not a forecast 5 M. Actual capital expenditure in the second quarter was 12% above Epoch’s trend, and operating cash flow 5% above it 28 M.

Capital expenditure has almost caught up with operating cash flow
Quarterly capital expenditure and operating cash flow of Microsoft, Alphabet, Amazon, Meta and Oracle, $bn
Sources: Epoch AI, “Hyperscaler capex vs. cash flow” (June 2026; data to Q2 2024) and our totals from quarterly 10-Q filings (from Q3 2024; they match Epoch to within $0.1bn). Capital expenditure is cash purchases of equipment, excluding finance leases. Quarters are calendar quarters; Oracle’s quarter ends in May, August, November and February – excluding Oracle, the share in April–June 2026 is 96%.

Companies differ. By Epoch’s estimate, Oracle already spends more than it earns from operations, Amazon is crossing that line now, Alphabet will around the start of 2027, Meta in the second half of 2027 and Microsoft in 2028 5 L. For Oracle and Amazon the facts match Epoch’s estimate: in fiscal 2026 (to May) Oracle spent $55.7bn against operating cash flow of $32bn 29 H; Amazon’s free cash flow over the 12 months to June was −$7.6bn 30 H. For Alphabet and Meta the facts are three to four quarters ahead of the estimate, though in individual quarters rather than on trend. Alphabet spent $44.9bn in the second quarter of 2026 against operating cash flow of $39.1bn 1 H. Meta spent $34.9bn in the third quarter of 2026 including payments on finance leases ($33.9bn in cash) against cash flow of $32.8bn 31 H.

Software has become capital-intensive

Even more important for valuations is the change in the structure of the business. In 2018–2023 the big four spent 11–14% of revenue on construction 22 M. Now Meta spends 39%, Microsoft 35%, Alphabet 30%, Amazon 22% and Oracle 83% 32 M. That is more than in the old infrastructure industries: AT&T invested 16.6% of revenue in its network in 2025, and the Union Pacific railway 15.5% 33 M. Investors pay high multiples for software precisely because it does not need constant large investment. That advantage is disappearing, and it is the most serious argument for lower valuations (see section 07).

AI companies put a larger share of revenue into construction than telecoms and railways do
Capital expenditure as a percentage of revenue
Sources: company filings (SEC), our calculation. For AI companies, the 12 months to June 2026 (Microsoft – fiscal year to June, Oracle – to May 2026); for AT&T and Union Pacific, 2025.

For the American economy this is already a noticeable amount. The four companies’ capital expenditure (worldwide, including Amazon’s logistics) equalled 0.13% of US GDP in 2015, 0.78% in 2024 and 1.22% in 2025, and on the plans for 2026 about 2.3% (our calculation from BEA data; the bases of the plans are mixed) 34,35 L. Investment in information-processing equipment and software reached 5.05% of GDP in the second quarter of 2026 – more than at the peak of the dot-com boom at the end of 2000 (4.46%) 36 M. Estimates of the contribution to growth differ. Jason Furman, an economist at Harvard University, credited it with 92% of US GDP growth in the first half of 2025 37 M, while Jan Hatzius, Goldman Sachs’s chief economist, said “essentially zero”, because most of the equipment is imported 38 M. Official BEA data (the contribution of equipment before deducting imports, excluding software and data-centre buildings) give something in between: information-processing equipment added on average 0.55 percentage points to the annualised growth rate in 2025 and 0.49 points in the first half of 2026 39 H.

Building is not confined to the US. According to a TrendForce forecast from May 2026, made before the summer price rises, the nine largest hyperscalers in the world, among them China’s ByteDance, Tencent, Alibaba and Baidu, will spend about $830bn in 2026, 79% more than a year earlier 40 M.

02 · Timeline2017–2026: how the hyperscalers went from servers to gigawatts

Until 2022 the capital expenditure of the big cloud companies grew together with their business: more customers, more servers. After the launch of ChatGPT the logic changed. Companies began to build for demand that is not yet covered by end-user revenue, and to count capacity not in servers but in gigawatts. The timeline below is assembled from the same reports and sources as the charts; the filter at the top shows construction, token prices, revenue, debt and stock-market valuations separately.

Milestones in the building of AI infrastructure, 2017–2026
Choose a category to see only its milestones; the links lead to the sources
Sources: company reports, Epoch AI, Stanford AI Index, press (see the links beside each milestone). The labels H, M, L show confidence in the source.

03 · TokensA token of fixed quality gets 10–20 times cheaper a year, while consumption grows at a similar pace

A token is a fragment of text, the unit in which a model measures input and output; in English it is roughly three-quarters of a word. Prices are usually quoted per million tokens. The Stanford AI Index 2025 recorded a more than 280-fold fall in the cost of using a GPT-3.5-level system between November 2022 and October 2024 3 H. According to Epoch AI’s table, a model scoring at least 64.8 on the MMLU test (GPT-3.5 level) cost $20 per million tokens in November 2022 and $0.07 in October 2024 (Gemini-1.5-Flash-8B) 4 M. For the GPT-4 level, the lowest price fell over 23 months from $37.50 to $0.18, about 208-fold 4 M. Epoch AI calculates that the price of reaching a fixed level of quality falls by 9 to 900 times a year, depending on the test; for the GPT-4 level on graduate-level science questions, by about 40 times a year. The fastest fall came in the past year; whether it will last is unknown 4 M. The venture capital firm a16z called this “LLMflation”: a tenfold fall in cost every year 41 M. From the end points of Epoch’s table ($20 and $0.07 over 1.8 years), the rate works out at about 22 times a year (our calculation) L.

But this figure describes a fixed level of quality, not what people actually buy. It compares GPT-3.5 in 2022 with a small model from another company in 2024 that scores at least as well on the old test. Today customers pay for the strongest models, and those prices behave differently. GPT-5 was launched in August 2025 at $1.25 per million input tokens and $10 per million output tokens, and GPT-5.5 in April 2026 at $5 and $30; GPT-5.6 Sol, according to OpenAI’s changelog, launched in July at the same price, and from 21 August a promotional price of $4 and $20 has applied until at least 21 November 42 H. Anthropic cut the price of Opus to a third in November 2025, to $5 and $25, and in June 2026 launched a still more expensive tier, Fable 5, at $10 and $50; Opus 5.5 has cost $4 and $20 since September 43 H. OpenAI’s Pro versions cost 6–12 times more than the standard ones 42 H. In addition, from version 4.7 the new Claude models split the same text into about 30% more tokens, so the price per token understates the rise in the price per page 43 H. According to the BenchLM index, the prices of flagship models rose by 61% in the 12 months to October 2026, while those of mid-tier models fell by 45% 44 L.

An answer of the same quality gets hundreds of times cheaper; flagships fall much more slowly
Price per million tokens, $ (weighted three input to one output). The scale is logarithmic: each division is ten times the last; read the labels, not the distance
Sources: Epoch AI, “LLM inference price trends” (the cheapest model reaching the GPT-3.5 and GPT-4 levels on the MMLU test); OpenAI and Anthropic price lists. Some Epoch points correspond to later, already reduced prices of models, so the fall may have begun slightly later than shown. Flagship prices are our weighted calculation from official price lists.

The market price actually paid for a mix of models has been falling since May 2026, but before that it was rising. The Silicon Data index, weighted by usage volumes, was launched in December 2025; as reported by Bloomberg, it almost doubled by May, peaking at about $2 (our calculation) 45 L. On 3 July 2026 the index stood at $1.62 per million tokens, and on 25 October at $0.95 45,46 M. It depends on the pattern of usage, not only on price lists. According to press reports, at the turn of August and September it fell below $1 for the first time, because of cheap open Chinese models and OpenAI discounts 47 L. Meanwhile, as reported by Bloomberg in July 2026, optimists estimate that total spending on tokens roughly doubled over the year, although list prices have fallen by more than 90% since 2023 48 L. This is the Jevons paradox: when a resource gets cheaper, its consumption grows so fast that total spending rises. Satya Nadella, chief executive of Microsoft, wrote about it on 27 January 2025, the day Nvidia’s shares plunged because of China’s DeepSeek 49 M.

How many tokens are processed

Google provides the longest open series of volumes. In May 2024 the company processed 9.7trn tokens a month across all its products and its API, in May 2025 480trn, in October 2025 1.3 quadrillion, and in May 2026 3.2 quadrillion 8,50,9 H. That is roughly 330-fold in two years — the same order as the fall in the price of a GPT-3.5-level answer. Through its API, Google’s models processed 22bn tokens a minute in the second quarter of 2026, against 16bn a quarter earlier 51 H. In January–March 2025 Microsoft processed more than 100trn tokens, five times as many as a year earlier 52 H.

Google processes 330 times more tokens than two years ago
Tokens a month across all Google products and its API, trn
Sources: speeches by Alphabet chief executive Sundar Pichai at the Google I/O conferences in 2025 and 2026 and on earnings calls. Google does not disclose which products and internal services are included in the count, or whether “reasoning tokens” are counted.

It is not only the number of queries that is growing but also the number of tokens per task. Reasoning models first “think” through hundreds or thousands of hidden tokens and only then answer. According to a study by the OpenRouter platform covering 100trn tokens, the share of reasoning models rose from almost zero to more than half over 2025, and the average request became about four times longer 53 M. According to Anthropic’s measurements in its own research system, an agent uses roughly four times as many tokens as a chat conversation, and a multi-agent system 15 times as many 54 H.

An important detail: consumption seems to be growing not so much because tokens have got cheaper as because models have learnt to do new things (our interpretation). In the same OpenRouter study, a 10% fall in a model’s price corresponded to a rise in usage of only 0.5–0.7% (a comparison between models on one platform, not a change over time; the platform is geared to independent developers) 53 M. Menlo Ventures, an investor in Anthropic, writes that on hard tasks customers are “fairly price-insensitive” and move to the best new model even when older ones get ten times cheaper 55 M. So for the excess-capacity hypothesis, what matters is not the price of a token but whether new uses keep appearing. So far they appear every quarter.

Why a token gets cheaper faster than hardware

Computation on the same hardware gets cheaper slowly. According to Epoch AI (data for 2010–2023, FP32 computation, before Blackwell), the number of operations per dollar on GPUs for AI doubled roughly every 2.1 years, that is, grew by ~39% a year 56 H. The AI Index puts the fall in hardware costs at 30% a year and the rise in energy efficiency at 40% 3 H. The rest of the fall in price comes from smaller models, better algorithms and competition: according to an estimate in a preprint by MIT researchers, algorithms alone give roughly a threefold cut in cost a year 57 M. Alphabet said that over 2025 it cut the unit cost of serving Gemini by 78% (the company did not specify the unit) 58 M. Nvidia promises that its new Rubin platform will cut the cost of a token by up to ten times compared with Blackwell for mixture-of-experts models (according to one independent analysis, by two to three times on other workloads); this is the manufacturer’s claim 59 L.

Hence the main arithmetic. If the number of tokens grows sevenfold a year and each token needs a third of the computation, the need for computation grows 2.3 times a year. Meanwhile hardware gets cheaper by only 1.4 times, so spending on it grows by roughly 1.7 times a year (our calculation) L. The calculator below lets you change these assumptions.

Calculator: a cheaper token, less hardware?

Set how fast the number of tokens is growing, by how much the computation per token of the same quality falls, and how fast hardware is getting cheaper. The calculator shows how the need for computation and spending on hardware change. Defaults: sevenfold annual growth in volume (Google, the year to May 2026), a threefold algorithmic cut in cost (the MIT preprint’s estimate), hardware getting 1.4 times cheaper (Epoch AI). The model is simplified: it does not take account of the shift to more expensive models or of companies’ pricing.

What data centres say

If cheaper tokens were reducing the need for capacity, it would show up in the leasing market. So far the opposite is visible. In the first half of 2026 vacancy in data centres in the main North American markets was 1.4% — a record low, though it was the same at the end of 2025; 7,481MW was under construction, and more than 80% had already been leased in advance 10 H. In July 2026 Microsoft said that customer demand continues to exceed available capacity 24 H, and Alphabet that the company is short of capacity and will rent it from third-party suppliers 60 M. The price of a one-year rental of an H100 GPU rose from $1.70 to $2.35 an hour between October 2025 and March 2026 61 M, and the Silicon Data index for neoclouds from $2.00 to $2.89 an hour between December 2025 and October 2026 (the FAQ on the same page gives $2.53) 62 M.

Signs of a glut have also appeared, but they were local. In March 2025 analysts at TD Cowen reported that Microsoft had walked away from about 2GW of capacity that was in the process of being leased 63 M. Yet in fiscal 2026 (to 30 June) Microsoft’s new finance leases came to $24.6bn, against $20.5bn a year earlier, and leases signed but not yet commenced, mostly for data centres, to $329.1bn 64 H. In China, according to local media reports, up to 80% of new computing capacity stood idle after a wave of more than 500 announced projects; among the reasons given was speculative building by local authorities 65 L.

The market came closest to testing the hypothesis on 27 January 2025. China’s DeepSeek said it had trained a strong model very cheaply, and Nvidia’s shares fell by 17% — the company lost about $590bn of market capitalisation, a one-day record 49,66 M. Analysts at SemiAnalysis quickly worked out that ~$6m was only the cost of the final stage of training, while DeepSeek’s servers had cost about $1.6bn 67 M. Within three weeks Nvidia’s shares had almost returned to their earlier level 68 M. And quarterly capital expenditure by the five biggest companies rose from $76bn in the fourth quarter of 2024 to $181.5bn in the second quarter of 2026 (Alphabet, Amazon, Meta, Microsoft and Oracle; Oracle’s quarter ends in May) 5 M. Building did not slow afterwards but accelerated; these data on their own do not prove a causal link with the cheapening of models.

04 · RevenueWho pays: the revenue of the two leading labs is about 10% of building costs

Hyperscalers do the building, but those who pay for computing are mainly the developers of models and their customers. The two biggest labs, OpenAI and Anthropic, already earn tens of billions of dollars a year, but they report differently, and headlines often mix up different things. Annualised revenue run-rate (run-rate) is revenue over a short recent period, scaled up to a year. Recognised revenue is what has reached the financial statements. Anthropic, for example, calculates its run-rate as consumption over the previous 28 days multiplied by 13, plus monthly subscriptions multiplied by 12 11 H. In addition, Anthropic counts sales through the AWS, Google and Microsoft marketplaces in full, on a gross basis 11 H, whereas OpenAI, according to the FT, counts only its own share 69 M. As a result, on 8 October 2026 OpenAI’s run-rate “shrank” in the press from almost $70bn to ~$50bn: all that changed was how sales through cloud partners are counted 69 M.

OpenAI: the biggest audience, the biggest losses

OpenAI does not publish public accounts. According to audited accounts obtained by Ed Zitron and checked by the Financial Times, the company booked revenue of $13.07bn in 2025 ($3.7bn in 2024), and its operating loss was $20.9bn — 160% of revenue; of $19.2bn of research costs, $10.6bn went to Microsoft 70 M. In the first half of 2026 revenue, according to the WSJ as relayed by one aggregator, was $12.4bn 12 L, and the operating loss, including share-based payments, was reportedly about $21.6bn 12 L. In February 2026 ChatGPT had 900m weekly users and 50m paying subscribers 71 M. According to an investor presentation reported in September by the FT and Reuters, OpenAI plans revenue of $36bn in 2026 and $350bn in 2030, and over 2026–2030 expects to spend about $856bn on computing and to have a cumulative negative free cash flow of $278bn 72 L.

Anthropic: the first lab with public accounts

On 26 October 2026 Anthropic published a prospectus for an initial public offering (Form S-1) — the first public financial statements of a frontier lab (the annual figures for 2025 are audited; those for the first half of 2026 are not). Revenue in 2025 was $4.59bn, against $386m in 2024; in the first half of 2026 it was $16.3bn, of which $11.6bn came in the second quarter 11 H. Spending on computing and infrastructure was 251% of revenue in the first quarter of 2025 and 48% in the second quarter of 2026: by the company’s explanation, revenue overtook a computing base bought 12–18 months in advance 11 M. According to the prospectus, in the second quarter of 2026 the company made an operating profit of $974m for the first time in the six-quarter series presented (from the first quarter of 2025); we have not checked this figure against the full text of the prospectus 11 M. About 90% of the net loss for the first half ($80.7bn) consists of a non-cash revaluation of convertible bonds, derivative liabilities and SAFE agreements ($72.4bn) 11 H.

Anthropic: revenue has caught up with computing costs
Revenue and spending on computing and infrastructure per quarter, $bn
Source: Anthropic, PBC — Form S-1 (26 October 2026), quarterly results. We did not open the full text of the prospectus (14MB): the quarterly values are taken from tables in secondary accounts and checked against the sum of the quarters (they match the half-year and annual totals).

Here is some evidence for the cheap-token hypothesis. In November 2025 Anthropic released Opus 4.5, a more powerful model at a third of the price of the previous Opus, and the quarterly growth of its revenue accelerated from 48% in the fourth quarter of 2025 to 132% in the first quarter of 2026 11 H. The prospectus mixes the effects of price, capabilities, new products and customer acquisition, so the contribution of the price cut alone cannot be isolated; but the cut clearly did not reduce revenue. For comparison: according to the prospectus, Anthropic’s revenue from customers on the Fortune 500 list averages less than 0.1% of their total spending, and for its ten biggest customers less than 1% 11 H; the company presents this as room for growth. According to anonymous sources cited by Bloomberg, at the end of July Anthropic’s annualised revenue run-rate reached $65bn (the latest official figure is $47bn in May; recognised revenue for the second quarter, annualised, is about $46bn, our calculation) 73 M.

How this compares with building costs

A simple comparison gives a ratio of about 13 to 1: ~$55bn of combined annualised run-rate of the two labs in spring 2026 (OpenAI ~$25bn at the end of February, Anthropic over $30bn at the start of April) against $725–760bn of planned capital expenditure 69,74 L. But the bases and dates are mixed here. If recognised revenue is compared with the actual capital expenditure of the big four over the same period, the share looks like this: 1.8% in 2024, 4.7% in 2025 and 9.7% in the first half of 2026 (our calculation, using cash capital expenditure excluding finance leases; Anthropic’s revenue is gross, OpenAI’s is net of the cloud partners’ share) L. If one takes the highest annualised run-rates (Anthropic $65bn, OpenAI ~$50bn) against the plan of $725–760bn, the result is about 1 to 6.5 L; the bases differ: Anthropic’s run-rate includes sales through cloud partners, OpenAI’s does not, and the dates differ (end of July and end of September). The share is growing fast, but even on the most generous count the labs’ revenue is a minority of spending.

Lab revenue is growing faster than spending, but is still a tenth of it
Capital expenditure of Microsoft, Alphabet, Amazon and Meta, and recognised revenue of OpenAI and Anthropic, $bn
Sources: company reports (SEC); Anthropic — Form S-1; OpenAI — audited accounts as reported by the FT and quarterly figures from the WSJ (secondary sources). The ratios are our calculation.

The labs are not the only buyers. Microsoft said that its AI business had an annualised revenue run-rate of $37bn in March 2026 (+123% on the year), and that Azure exceeded $100bn for the first time in fiscal 2026 75,76 H. In the second quarter of 2026 Google Cloud’s revenue was $24.8bn (+82%, including the acquired Wiz), with an operating margin of 35.6% 2 H. AWS made $42.2bn (+37%) with a margin of 39.4%, but in the same quarter added $48.6bn of equipment — more than its entire quarterly revenue 30 H. Meta has no separate AI revenue: third-quarter revenue rose by 26%, ad impressions increased by 10% and the average price per ad by 14% 7 H.

The $2.5trn backlog and who stands behind it

The strongest argument of the optimists is signed contracts. Customer commitments to Microsoft as of June 2026 are $678bn, to Oracle as of August $664bn, Google Cloud’s backlog is $514bn, AWS’s $496bn and CoreWeave’s $104bn 64,77,2,30,78 H. In all, about $2.5trn — roughly 4.3 times the capital expenditure of Alphabet, Amazon, Meta, Microsoft and Oracle over the past 12 months ($566bn) and three times the big four’s plan for 2026 (our calculation). The figures are not uniform, and part of the commitments of OpenAI and Anthropic may be counted in the backlogs of several companies at once 32 L.

Hyperscalers’ signed contracts — about $2.5trn
Customers’ unfulfilled commitments (backlog), $bn, mid-2026
Sources: company quarterly reports. The measures are not quite identical: Microsoft — commercial contract commitments, Google — the cloud unit’s backlog, Oracle and CoreWeave — remaining performance obligations (RPO). OpenAI’s share of Oracle’s backlog (about half) is estimated by S&P Global Ratings.

But this money is concentrated among a few customers and will arrive over years. By S&P’s estimate, about half of Oracle’s backlog is contracts with OpenAI 79 M, and only 13% of Oracle’s entire backlog falls in the next 12 months 77 H. Part of the suppliers’ revenue is money they have themselves put into customers. In the second quarter of 2026 Amazon booked a $50.5bn gain from revaluing its stake in Anthropic, and Anthropic committed to spend more than $100bn at AWS over ten years 30 H. Microsoft received $24.1bn of revenue from OpenAI in fiscal 2026 and at the same time owns about 25% of OpenAI 64 H. At Nvidia one direct customer (which may be a server maker or a distributor) accounted for 16% of revenue in the quarter to 26 July 2026 80 H.

How much revenue is needed

Estimates of the revenue needed move in step with capital expenditure: they are models that derive the required revenue from building costs. David Cahn of the venture firm Sequoia calculated in September 2023 that AI needed ~$200bn of revenue to pay back the building then under way; in June 2024 the figure was $600bn 81,82 M, and in July 2026 about $3trn 83 L. The consultancy Bain wrote in 2025 of $2trn of new annual revenue by 2030, and in 2026 of $6trn of total annual AI revenue by 2031, of which existing applications could supply $1.2–1.8trn 84,85 M. JPMorgan estimated that a 10% return on investment requires ~$650bn of revenue a year — about $35 a month from every iPhone owner 86 M. Goldman Sachs, as relayed by the press, regards ~$300bn a year as the break-even threshold for hyperscalers 87 L. For comparison: Epoch AI, drawing on an estimate from Exponential View, put all generative-AI revenue in June 2026 at ~$175bn a year 88 L.

Whether AI pays off for customers is still unknown. The 2025 MIT NANDA report, which drew on a review of more than 300 public initiatives, 52 interviews and a survey of 153 executives, claimed that 95% of organisations had received no measurable return from generative-AI pilot projects 89 M; critics note that interviews were conducted at only 52 organisations, and that every pilot that did not reach full deployment is counted as a failure 90 L. In McKinsey’s 2026 survey (from a summary in search results; we did not open the full text), 37% of respondents reported some impact of AI on operating profit, and only ~6% an impact of 5% or more 91 L. Meanwhile the share of American firms using AI in their work rose, according to the US Census Bureau, from 17.2% at the end of 2025 to 24.6% in October 2026 92 H.

05 · DepreciationHow spending turns into profit: servers are written off over 5–6 years, but the money has already been spent

Capital expenditure does not reduce profit at once. A company pays for a server today, but in its income statement it writes off the cost in instalments over the server's useful life — this is depreciation. While the building boom continues, depreciation lags behind spending. In fiscal 2026 Microsoft spent $115.9bn on equipment, while depreciation was $34.3bn; two years earlier it was $15.2bn 32,64 H. In the first half of 2026 Alphabet spent 5.9 times more on construction than it wrote off 2 H. In other words, today's profits — and today's low P/E ratios — do not yet carry the main weight of the spending already done.

Spending on construction is 3–7 times current depreciation
Capital expenditure and depreciation in the latest full year, $bn
Sources: companies' annual 10-K reports. Microsoft — fiscal year to June 2026, Oracle — to May 2026, the rest — calendar 2025. Capital expenditure is cash purchases of property and equipment excluding finance leases: at Microsoft these added about $24.6bn more in fiscal 2026; Amazon is shown on gross purchases ($131.8bn; $128.3bn by the company's own definition), Meta excluding the principal of finance leases ($69.7bn; $72.2bn by the company's definition). For Amazon, depreciation is of property and equipment by segment; for Meta, depreciation includes intangible assets.

A useful life that has been extended six years running

How many years a server counts as useful is decided by the company itself, and since 2020 all the big hyperscalers have lengthened this period. Microsoft raised it from 3 to 4 years in fiscal 2021 and to 6 years in 2023; the first decision added $2.7bn to operating profit, the second $3.7bn 93,94 H. Alphabet moved to 6 years in 2023, which cut depreciation by $3.9bn 95 H. Meta has used 5.5 years since 2025 (−$2.92bn of depreciation) 96 H, Oracle — 6 years from fiscal 2025 97 H, CoreWeave — 6 years 98 H. Amazon is the only one to have moved some servers back from 6 to 5 years: from 2025, “because of the pace of development in AI”, which added $1.4bn of depreciation 99 H. From fiscal 2027 Microsoft will also depreciate data-centre buildings over 25 years rather than 15 24 H.

Servers' useful life in company accounts has been extended from 3–4 to 5–6 years
Period over which companies write off the cost of servers, years
Sources: companies' annual 10-K reports. Year — when the change took effect; for Microsoft, the fiscal year. Since 2025 Amazon has used 5 years only for some servers and networking equipment.

In November 2025 the investor Michael Burry claimed that, because of the longer lives, hyperscalers would understate depreciation in 2026–2028 by about $176bn, and that Oracle's and Meta's profits would be overstated by 27% and 21% by 2028 100 M. He did not publish his calculation 101 L. Footnote Brief, using its own model, puts the understatement of depreciation for 2026–2028 anywhere from $80–100bn (if all servers last 5 years) to $280–320bn (if AI hardware lasts 3 years); this is the author's assumption, not company data 102 L. Nvidia replied to analysts that its customers depreciate its chips over 4–6 years, and the company's chief financial officer said that A100s, released six years ago, are still fully utilised 103,104 L. Microsoft's chief financial officer Amy Hood said that many of the company's GPUs are already contracted for most or all of their useful life 105 L. The problem lies elsewhere: Nvidia now releases a new generation every year — Blackwell in 2024–2025, Vera Rubin in 2026, Rubin Ultra in 2027, Feynman in 2028 106 M. Critics believe that each new generation devalues the previous one faster than happened with servers for conventional cloud services. The rental market does not show this yet: six-year-old A100s are still rented out, and the price of the H100 has risen since December 2025 107,62 M.

What an hour of GPU time costs

The best market test of useful life is the rental price. The list price of an H100 at the hyperscalers stood at $7–9 an hour in 2023–2024 and fell to about $6.3 in the second half of 2025 108 M; on 1 June 2025 AWS cut the H100 price by 44% 109 H. In the Silicon Data index for neoclouds the price fell to $2.00 (9 December 2025) but has been rising again since: on 26 October 2026 the index stands at $2.89, 44% higher (in the FAQ on the same page it is $2.53); the Ornn index of actual deals is $3.03 62,110 M. In a Silicon Data blog post the median for the neocloud segment in the second half of 2025 was about $3.3, and for marketplaces about $1.95: these are series with different definitions 108 M. Renting an A100, released in 2020, still costs $1.3–1.6 an hour (the Silicon Data index page shows two values: $1.56 and $1.29) 107 M. According to a 2024 model by Latent Space analysts, an H100 earns more than 20% a year at $4.50 an hour, just over 10% at $2.85 and makes a loss below $1.65 111 L.

H100 rental prices fell by about a third and are rising again
Rental price of one Nvidia H100 GPU, $ per hour
Sources: Silicon Data (median of hyperscaler list prices; index for neoclouds), SemiAnalysis (annual contracts), Ornn Compute Price Index (actual deals). The series have different definitions and are not continuations of one another.

Hyperscalers' margins on AI are lower than on conventional cloud services. Microsoft's cloud gross margin fell from 71% in fiscal 2024 to 66% in 2026, and the company explicitly attributes this to AI infrastructure 64 H. According to documents obtained by The Information, in the quarter to August 2025 Oracle earned a gross margin of only 14% on renting out Nvidia servers 112 M; at a meeting with analysts in October 2025 Oracle said that management's target is a 30–40% gross margin over the full term of the contracts, including the initial loss-making phase 113 L. CoreWeave, which only rents out GPUs, had an adjusted EBITDA margin of 57% in the first half of 2026 but, after depreciation ($2.5bn) and interest ($1.2bn), a net loss of $1.4bn 114 H.

Where a dollar of capex goes

Epoch AI modelled what a 1GW AI data centre in the US is made of: about $37.9bn of one-off costs, of which 56% is servers, 30% the building, cooling and electrical systems, and 13% networking 115 M. Operation costs about $0.9bn a year, mostly electricity 115 M. If servers last 5 years and the building 14, the full annual cost of one gigawatt, including a return on capital, is $8.5bn; if servers last 3 years, it is $12–13bn 115 M. Nvidia gives a higher figure — $50–60bn per gigawatt (a statement of August 2025; Bernstein estimates about $35bn). In October 2026 Jensen Huang said that Nvidia's own content per gigawatt already exceeds $40bn. These are claims by a supplier, not reported figures 116,117 L.

More than half the cost of an AI data centre is servers, which become obsolete within a few years
One-off costs of a 1GW AI data centre in the US, $bn (Epoch AI model)
Source: Epoch AI, AI data-centre cost model (2026). An estimate, not company reporting.

This structure is the key to the question of whether hardware will become a cheap commodity after the boom. Buildings, grid connections and fibre will last for decades, as railway tracks once did. Servers will not: they will have to be replaced every few years, and every replacement is new capital expenditure.

Calculator: how much revenue is needed to pay back a year of construction

Set annual capital expenditure, the share of servers, useful lives and the cost of capital. The calculator works out the full annual cost of the hardware — depreciation plus the return investors expect, plus operation — and the revenue needed to cover it, if a given share of revenue can be spent on hardware. The shares, operating costs and server useful life in the default values come from the Epoch AI model and company reports; the 9% cost of capital and the 20-year useful life of buildings are our assumptions (Damodaran gives 7.8% for computer services and 9.3% for software; Epoch takes 14 years for a building, Microsoft 25). The 50% revenue share is Sequoia's assumption; it is close to the 48% of revenue that Anthropic spent on compute in the second quarter of 2026 (in the first quarter of 2025 it was 251%; revenue in the second quarter rose by 144%, and compute is bought 12–18 months ahead; the S-1 figure is taken from secondary reporting). The calculation covers the spending of a single year only.

06 · FinancingFrom their own pockets to debt: bonds, leases, private credit and circular deals

As long as capital expenditure was smaller than operating cash flow, hyperscalers built with their own money and still bought back shares. In 2023 the operating cash flow of the five companies covered capex 2.4 times, in 2025 1.5 times (in the first quarter of 2025 also 1.5 times), and in the first quarter of 2026 only 1.06 times (our calculation from Epoch AI data) 5 L. The big four's free cash flow peaked in 2024 ($230bn) and fell in 2025 to $204bn, although operating cash flow rose by 27% 22 M. In 2026 negative free cash flow appeared at Alphabet (−$5.9bn in the second quarter) and Meta (−$2.1bn in the third quarter), while at Amazon it was negative over the 12 months to 30 June (−$7.6bn by the company's definition) 1,31,30 H.

The big four's free cash flow has begun to shrink
Operating cash flow minus capital expenditure per calendar year, $bn
Sources: company reports (SEC), our calculation. Microsoft is recalculated to the calendar year. In 2021–2022 Amazon's negative free cash flow was linked to warehouses for online retail, not to AI.

Bonds, shares and leases

The difference began to be borrowed. In 2025 Amazon, Alphabet, Meta, Microsoft and Oracle together sold $121bn of US dollar bonds, against an average of $28bn a year in 2020–2024 118 M. The biggest deals: Oracle $18bn in September, Meta $30bn in October, Alphabet $17.5bn and Amazon $15bn in November 118 M. In 2026, up to 3 September, the same companies together with SpaceX had already borrowed more than $180bn 119 M; in May Meta sold $25bn of bonds, and its debt rose to $84bn 7 H. They borrow for the long term: 41% of these companies' bonds issued in 2025–2026 have a maturity of more than 15 years, and Alphabet sold sterling bonds maturing in 2126 119 M. The equipment this money pays for is written off over 5–6 years.

In 2025 hyperscalers borrowed 4.3 times more than in an average year before the AI boom
US dollar bonds sold by Amazon, Alphabet, Meta, Microsoft and Oracle, $bn
Sources: BofA Securities via Reuters (2020–2025); Twenty Four Asset Management (2026, up to 3 September; including SpaceX). The market expects about $250bn for the whole of 2026.

Besides debt, companies sell shares. In June 2026 Alphabet raised $49.6bn through new shares and mandatory convertible preferred stock 2 H. In a single quarter Oracle sold $19.9bn of shares 77 H. And the largest part of the obligations is not visible in capital expenditure at all: these are leases for data centres that have been signed but have not yet commenced. According to the latest reports (as of dates from 30 June to 30 September 2026) they add up to $1.23trn 7 L.

Another $1.23trn is data-centre leases that have not yet commenced
Future payments under leases signed but not yet commenced, $bn (undiscounted)
Sources: companies' quarterly 10-Q reports (notes on leases and contractual obligations). The amounts for Oracle ($288bn) and CoreWeave ($35.5bn) could not be checked against the primary source; Alphabet's amount is confirmed by the debt prospectus.

Part of the construction is moved off the balance sheet through special-purpose vehicles (SPVs). Meta's Hyperion campus in Louisiana is financed by $27.3bn of bonds issued by a joint venture controlled by the Blue Owl fund. Meta leases the campus in four-year blocks and guarantees the owners the residual value over 16 years if it does not renew the lease 120 M. At 30 September 2026 Meta's maximum possible loss under such structures was $68.4bn, of which $41.5bn is residual value guarantees 7 H. In August 2026 Nvidia guaranteed up to $105bn of lease and power payments, under 20-year contracts, for a 4.25GW campus in Ohio belonging to an OpenAI partner 80 H.

Where debt is already expensive

The risk is spread unevenly. Highly rated hyperscalers borrow cheaply. Oracle, which is building for OpenAI's contracts, no longer does. On 9 July 2026 S&P cut the company's rating to BBB-, one notch above “junk”, and forecasts a free cash flow deficit of almost $42bn for fiscal 2027 79 M. The price of five-year credit default swap (CDS) protection on Oracle reached 288 basis points on 15 October 121 M. CoreWeave, the largest independent renter of GPUs, had $35.1bn of debt at 30 June and paid $640m of interest in the quarter, against $267m a year earlier 78 H. Its bonds due 2032 traded in October at about 78 cents on the dollar with a yield of more than 16%, and the price of CDS protection exceeded 1,000 basis points 121 M.

Banks expect debt to become the main source. In 2025 Morgan Stanley put the data-centre “financing gap” to 2028 at about $1.5trn — money that companies' own funds will not cover 122 M. In mid-2026 JPMorgan raised its estimate of AI capital expenditure to 2030 from $5.1trn to $5.5trn and expects debt to finance $4.1trn of it 123 M.

Three-quarters of construction to 2030 is expected to be financed by debt
How, in JPMorgan's estimate, $5.5trn of AI capital expenditure in 2026–2030 will be financed, $trn
Source: JPMorgan Global Research, mid-2026 review (via Fortune). A forecast; the share of own funds is calculated as the difference.

Circular deals

A separate risk is deals in which a supplier finances a customer and the customer buys from the supplier. According to Trending Topics, the IMF's Global Financial Stability Report (October 2026) paints the following picture: in 14 public deals since 2023, hyperscalers have put about $300bn of equity into AI companies and extended about $650bn of debt, while the AI companies have committed to spend $1.4trn with them; we have not checked the report itself. The IMF calls such interdependence “wrong-way risk”: the investment loses value just when the revenue linked to it dries up 124 M. The best-known headlines, meanwhile, overstate the real money: “up to $100bn” from Nvidia for OpenAI was only a letter of intent, and in the March 2026 round Nvidia put in $30bn 125,126 M; of Amazon's $50bn, as of 30 June 2026 it had invested $28.7bn, and a further $21.3bn remained a commitment 30 H; according to Bloomberg Law, $35bn of the $50bn was conditional (an OpenAI stock-market listing or a technical milestone), but in Amazon's 10-Q part of this tranche is already shown as invested 127 M.

Who pays whom: suppliers' investments and labs' purchases
The arrow “→” is money or equity from a supplier to a lab; “←” is a lab's commitment to buy compute from the supplier
$30bn → · ← 10 GW (intent)share warrants → · ← 6 GW~25% stake · ← $250bn of Azure← ~$300bn of compute$50bn → · ← $138bn of AWS← $44.9bnstake → · ← over $100bnup to 1m TPUs · ← $114.5bnNvidiachipsAMDchipsMicrosoftAzure cloudOraclecloudAmazonAWS cloudGooglecloud, TPU chipsOpenAIlabAnthropiclab
Sources: Microsoft (OpenAI recapitalisation, 28 October 2025; the stake of about 25% is from the 10-K for fiscal 2026), AMD (deal with OpenAI, October 2025), Amazon (10-Q for the second quarter of 2026), Anthropic (S-1), Bloomberg Law (OpenAI's March 2026 round: Nvidia $30bn; in February Bloomberg and the WSJ reported about $20bn), Tomasz Tunguz's summary of deals (Oracle). The amounts have different horizons and terms; “intent” is a non-binding letter of intent.

History has seen this before. In 2000 Lucent, Nortel and Cisco lent $25–30bn to telecoms start-ups so that they would buy their equipment. Within a year the share of problem loans rose from 2.6% to 60% at Lucent and from 25.5% to 80% at Nortel 128 M.

The first stresses have already occurred. On 28 April 2026, after reports that OpenAI had missed its internal targets for user and sales growth, CoreWeave's bonds fell to a record low and Oracle's CDS protection became more expensive 129 M. In October 2026 the IMF named a correction in AI as one of the likely near-term triggers of a sharp deterioration in financial conditions worldwide 124 M. The Bank of England had already warned of the risk of a sharp correction in October 2025 130 M.

A side effect: defence AI

For Ukraine this topic matters indirectly: the money flowing into AI also flows into defence technology. Venture funding of defence start-ups worldwide held at $2.8–3.8bn a year in 2022–2024, reached a record $9.6bn in 2025 and, in 2026 up to 2 June, exceeded $14.6bn 131 M. Most of it went to a few companies: in May Anduril raised $5bn at a valuation of $61bn, twice that of a year earlier 132 M; Shield AI and Saronic raised a further $3.75bn 131 M; in July Helsing raised $1.8bn, the largest round in the history of European defence 133 M. Meanwhile, in the first half of 2026 AI companies received 86% of all venture money in the US 134 M.

Defence start-ups received more in the first five months of 2026 than in the whole of record-breaking 2025
Venture investment in defence technology, $bn
Sources: Crunchbase News (world, 2 June 2026); Brave1 via Kyiv Post (Ukraine — disclosed investment, 50+ start-ups). Definitions of “defence technology” differ between sources.

Ukrainian defence start-ups are small by comparison: according to Brave1, disclosed investment in them in 2025 exceeded $105m — about 1% of the global total 135 M. The most notable event was Swarmer's listing on Nasdaq in March 2026: the shares rose by almost 520% on the first day, and market capitalisation exceeded $650m 136 M. Such listings depend on the market's appetite for AI. If valuations of AI companies fall, the first to suffer will be the late rounds of large defence companies valued in the tens of billions, and the window for new listings. Ukrainian manufacturers that live off state orders and grants will feel it indirectly — through dearer and scarcer private capital (our estimate) L.

07 · MultiplesWill P/E ratios fall to 10–12: at Nvidia compression has already happened through earnings growth, at Oracle through a falling share price

P/E is the share price divided by earnings per share. Forward P/E uses the earnings forecast for the next year (for indices and sectors, the next 12 months); trailing P/E uses actual earnings for the past 12 months. The hypothesis’s starting point, “50–70”, does not match any large AI company as of October 2026: Palantir trades even higher, at 85. According to Finviz on the morning of 26 October, forward P/E was 23.5 for Amazon, 22.4 for Microsoft, 20.9 for Alphabet, 18.9 for Meta, 18.3 for TSMC, 16.9 for Broadcom, 13.6 for Nvidia and 11.5 for Oracle 13 M. Another service, StockAnalysis, gives 17.8 for Nvidia, probably because of a different forecast horizon 14 M. AMD (32), Intel (about 40) and Palantir (85) trade noticeably higher 13,17 M. For the S&P 500 as a whole, forward P/E is 19.0: almost the same as the 10-year average (19.1) and slightly below the five-year average (19.8); for the information technology sector it is 20.4, below its own five-year average (25.5) 15 H.

Trailing P/Es are misleading at the moment, too. In the second quarter of 2026 Alphabet booked $98bn of profit from revaluing its stakes in other companies, and Amazon $53.4bn of other income, mostly from its investments in Anthropic (section 04 gives a narrower measure: $50.5bn from revaluing its stake, according to the 10-Q). This money does not come from the core business 15 H. Because of it, Alphabet’s trailing P/E (16.1) is lower than its forward P/E (20.9) 13 M.

Most big AI companies already trade on the multiples of “conservative” industries
Forward P/E: for companies, share price to forecast earnings for the next fiscal year (Finviz, morning of 26 October 2026); for the S&P 500 and the utilities sector, to earnings for the next 12 months (FactSet, 16 October)
Sources: Finviz (all companies in a single snapshot; companies’ fiscal years end in different months); FactSet Earnings Insight, 16 October 2026 (S&P 500 and utilities sector). CoreWeave has no earnings, so there is no P/E. Values change by 0.5–2.5% a day.

Nor do the “conservative industries” trade at 10–12. The utilities sector in the S&P 500 has a forward P/E of 16.3, the railways Union Pacific and CSX 20.5 and 21.9, Coca-Cola and Procter & Gamble 26.1 and 21.6, JPMorgan 13.1, Exxon 14.8 15,17 M. Only telecoms companies fall below 10: Verizon 8.3, AT&T 8.1, Comcast 6.3 17 M. So a P/E of 10–12 is not the level of “boring industries” in general: below that range trade only highly indebted, slow-growing network industries (telecoms, 6.3–8.3), and within the range, among the companies named, there is today only Oracle.

How Nvidia compressed its P/E while its value rose tenfold

The best example of compression having already happened is Nvidia. From January 2023 to October 2026 its market capitalisation grew about 10.4 times (from $501bn to $5.2trn), while its trailing P/E fell from 114.7 to 27.2, because earnings over 12 months rose about 44 times. In January 2023 the P/E was inflated by abnormally low earnings (≈$4.4bn); from January 2022 it fell from 58.6, while earnings rose about 20 times 16 L. In the second quarter of fiscal 2027 (to 26 July 2026) Nvidia’s revenue was $96.2bn (+106% year on year), and guidance for the third quarter is $108bn 137 H. But Nvidia’s revenue depends to a large extent on its customers’ capital expenditure. If that spending stops growing, Nvidia’s earnings growth will stop, and its multiple will have to be re-rated (our estimate) L. Nvidia’s P/E of 27.2 is on a GAAP basis, and it, too, contains non-operating gains (our note) L.

When P/Es really did fall to 10

History knows compression of this size, and it happened to companies whose earnings were growing. In September 1999 Morgan Stanley valued Microsoft at 66 times expected annual earnings 138 H. At the end of 2012 Microsoft’s trailing P/E was 11.7, and in 2013 it was 11.4 139 M. According to Boston Partners (earnings basis not stated), the company’s P/E fell from 53 to 9 in 2000–2011, although its revenue more than tripled and its operating profit more than doubled; the shares regained their 1999 record (nominal, excluding dividends) only in October 2016, after 17 years 140,141 M. Cisco’s P/E at the end of fiscal 2000 was 166, and at the end of fiscal 2010 it was 17 (both on earnings for the past 12 months) 142 M; Cisco’s shares exceeded their March 2000 record only on 10 December 2025, after 25.7 years 143 M. The economist Jeremy Siegel found that shares that traded for years at more than 50 times annual earnings tended to lag the market over the next 25 years 144 M.

Microsoft and Cisco after 2000: earnings rose while the multiple fell for a decade; Nvidia for comparison
P/E at calendar year-end; exceptions: Microsoft 1999 is for September (price to expected earnings), Cisco 2000 is for the end of the fiscal year (July), and the final points are for October 2026 (trailing 12-month earnings). Dashed line: years without data
Sources: SEC, Form S-4 (Microsoft, 1999, Morgan Stanley estimate); Motley Fool, citing Capital IQ (Cisco, fiscal 2000; the fiscal 2010 figure, 17, appears in the text only, and on the chart 2010 is the calendar year-end); CompaniesMarketCap (the rest). The 1999–2000 bases differ from later ones; the jumps in 2017–2018 were caused by one-off tax charges that reduced earnings.

What made these companies’ P/Es low? Not cheaper products, but slower growth and a new role: from “the future” they became “infrastructure”. Regulated industries show another pattern: the role of debt. In June 1947 the least indebted US electric utilities traded at 16.4 times annual earnings, the middling ones at 13.1, and the most indebted at 9.0 145 H. Analysts at LPL Research in July 2026 put the question in just this way: are hyperscalers still software platforms or already infrastructure assets 146 M?

A live example of compression already exists, and it is Oracle. The company’s market capitalisation peaked at about $900bn in September 2025 and on 26 October 2026 stood at $383bn (about −57%, our calculation based on market capitalisation; the fall in the share price is larger); in the week to 26 June the shares fell by about 19%, the worst week since 2001 21 M. Its forward P/E is 11.5 13 M. CoreWeave’s shares trade about 70% below their peak of about $187 (our calculation based on data from The Daily Upside and Finviz; the peak may be intraday) 13 L. The market already distinguishes those who build from their own cash flow from those who build on debt.

What it would take for P/E to fall to 12

The arithmetic is simple. If Microsoft’s forward P/E falls from 22.4 to 12 and earnings do not change, the shares will lose 46% of their value. For the price not to fall, earnings must grow by about 13% a year for five years in a row (our calculation) L. Analysts so far expect more: earnings of S&P 500 companies are due to grow by 32.8% in 2026 and by 16% in 2027, but the pace is slowing: +28.6% in the fourth quarter of 2026, +19.3% in the first quarter of 2027 and only +2.8% in the second quarter of 2027 15 H. Moreover, this growth is concentrated: excluding Nvidia and Meta, earnings of the Magnificent Seven will grow by only 7.5% in the third quarter of 2026 15 H, while 42 AI companies have accounted for 67% of the S&P 500’s price rise and 58% of its earnings growth since January 2024 147 M. The seven largest companies made up 34.3% of the index’s market capitalisation at the end of 2025 148 M. The long-term gauge of market valuation, the Shiller CAPE, which is the price divided by average inflation-adjusted earnings over 10 years, stood on 23 October 2026 at 40.4, against an all-time high of 44.2 in December 1999 149 M.

Investors are nervous but not selling. In Bank of America’s survey of fund managers in October 2026, the net share of those holding more technology shares than usual reached 37%, the highest since August 2020, and 45% named buying chipmakers’ shares the most crowded trade in the market 150 M.

Calculator: what happens to a share price if the P/E is compressed

The share price equals P/E multiplied by earnings. Set the current P/E, the P/E after a number of years and the earnings growth rate, and the calculator will show how the price changes. The historical examples fill in the P/E and the period, and the Nvidia example also fills in the actual earnings growth rate; for the rest, set the rate yourself. This is arithmetic, not a forecast and not investment advice.

08 · HistoryRailways, the telegraph and fibre: they built ahead of demand, investors lost money, and the networks served the next generation

The hypothesis we started with rests on a historical analogy: AI infrastructure repeats the railways and fibre. Construction runs ahead of revenue, revaluation of assets hits market capitalisation, and the capacity becomes the cheap raw material of the next decade. History confirms this pattern, but with important qualifications.

Britain’s Railway Mania of the 1840s

In 1844 the British Parliament authorised 810 miles of new railways, in 1845 2,816 and in 1846 4,540; in 1846 alone 263 acts creating new railway companies were passed 151,152 H. Investment peaked in 1847 — according to a reconstruction by the researcher Andrew Odlyzko, at about 7% of the country’s GDP, more than twice military spending 18 L. Railway share prices roughly tripled between 1843 and 1845; after the Bank of England raised its discount rate on 16 October 1845, a long decline began — by the end of 1849 about 60% below the peak 153,18 M.

Construction lagged the money by one to two years: authorisations peaked in 1846, spending in 1847 and openings of new lines in 1848, at 1,182 miles 154 H. When the new tracks went into operation, revenue per mile fell by 27% (1845–1848) and returned to its 1845 level only in 1856 (£2,527 against £2,499) 18 L. Lines authorised in 1845 promised a 7% return on capital, while the new lines of 1844–1846 earned, by Odlyzko’s rough estimate, about 4.5% 18 L. The main mistake was demand forecasts, not technology 18 M.

Britain: railway authorisations soared in 1846, and new track went on opening for several years
Miles of new railway authorised by Parliament and miles opened to traffic, per year
Sources: NBER Macrohistory Database via FRED (authorised and opened miles); Andrew Odlyzko, “Collective hallucinations and inefficient markets: The British Railway Mania of the 1840s”, table 2 (revenue per mile; the figures are taken from Odlyzko’s paper, and we could not verify the primary file independently).

By the end of 1850 the British had invested about £250m in railways — almost half of annual GDP — and lost, by Odlyzko’s estimate, about a third of it, £80m 18 L. But almost no line went bankrupt to the point of closing: the tracks kept working, and the country, most likely, gained 18 M. The network grew from 1,498 miles in 1840 to 6,621 miles in 1850 (according to Odlyzko’s table 2) 18 L. Cumulative investment in British railways reached £1bn only in 1890, and the profits that The Times had promised in the 1840s appeared only shortly before the First World War 18 M.

The US: record building, and between 15% and a quarter of the network in receivership

American railways were built in waves. In 1887 a record 12,876 miles of track were laid 155 H. The Panic of 1873 began with the failure of Jay Cooke, the bank that financed the Northern Pacific; by November 55 railways had failed 156 M. In 1893 alone more than 27,000 miles of railway, with a capitalisation of almost $2bn, went into receivership (by Stuart Daggett’s count, 1908) 157 M. By our estimate, that is about 15% of the network at the time L. Bradstreet’s magazine for 1893 put the share higher, at 24% of network length, but this estimate is disputed 158 L. The railways went on carrying freight. And from 1920 the law set a “fair” return for them — 5.5% on the value of property, later 5.75% — and the state took half of any surplus above 6%. The railways rarely reached this return, so they became a regulated industry with a capped return 159 M.

The telegraph, electricity and cars

The first reliable transatlantic cable, in 1866, charged $10 a word and ran at about 5% of capacity. The next year the tariff was halved, and daily revenue rose by only about 12% 160 M. Cheaper prices do not fill capacity at once. In the 1920s American power holding companies built ahead of demand: in 1929 peak-hour reserve capacity was 27.5% 161 M. Samuel Insull’s empire, which covered 39 states, went into receivership in April 1932 with losses of almost $800m 162 M; from 1929 to 1936, 53 power holding companies failed, while the power stations kept running 145 H. The number of car makers in the US fell from 88 in 1921 to 44 in 1927 163 M.

Fibre, 1996–2002: the closest analogy

The “cheaper means less is needed” hypothesis is best tested by fibre. In the five years after the Telecommunications Act of 1996, US telecoms companies invested more than $500bn in networks, mostly with borrowed money 164 M. Meanwhile the technology advanced twice as fast as Moore’s law: the capacity of a single fibre rose from 2.5Gbit/s in 1996 to ~100Gbit/s in 2000, doubling about every nine months 165 H. Yet consumption of telecoms services grew by only 7.4% a year 165 H. Internet traffic doubled every year, not every 100 days as investors then believed 166 M. This is where falling prices outran demand, and in 2001 transatlantic cables were lit to 11.6% of potential capacity 167 M.

The consequences are well known. Global Crossing, valued at $47bn at its peak, went bankrupt in January 2002 and was bought in 2011 for $3bn 168 M. On 21 July 2002 WorldCom filed what was then the largest bankruptcy in US history, with assets of more than $107bn 169 M. Nortel’s market capitalisation fell from C$398bn to less than C$5bn, and Lucent’s shares fell by 99% 170 M. Holders of telecoms bonds recovered a little over 20% 164 M. By Odlyzko’s estimate, the real excess of investment over trend was only ~$150bn, and the stock-market losses were many times larger 18 L.

And then the surplus really did become a raw material. The price of IP transit fell from $1,200 per Mbit/s a month in 1998 to $75 in 2005 and $5 in 2010 19 L; in 2026 the weighted median price in key US and European cities is $0.08 20 M. In 2005 Google was buying up unneeded “dark” fibre 171 L, YouTube appeared the same year, and Google bought it for $1.65bn in 2006 172 M; Netflix launched video streaming in January 2007 173 M. According to an iSuppli analyst, the fibre surplus was absorbed only about ten years later 174 L. The economist William Nordhaus calculated that of the social return on technology in the US in 1948–2001, the innovating companies captured only a meagre share — a few per cent (Tim Harford cites 3.7%; the figure has not been checked in the paper itself) 175 L.

After the boom the wholesale price of IP transit fell, by a rough estimate, by a factor of 10,000–20,000
Wholesale price of IP transit in the US, $ per Mbit/s a month. The scale is logarithmic: each division is 10 times the one before
Sources: DrPeering.net (1998–2015; a survey of specialists at industry conferences, very approximate; the 2015 point is a 2010 forecast); TeleGeography (2026, weighted median price in key US and European cities, different methodology; the ratio of the two estimates gives an order of magnitude only).

How big the current boom is

Comparisons of booms as a share of GDP depend on definitions, so we show them separately. Stijn Van Nieuwerburgh, an economist at Columbia University, in a Brookings podcast summarising his paper, compared average US spending over the years of each boom (he himself warns that the estimates for different booms are not harmonised): railways in 1870–1890 — 2.2% of GDP, highways — 1.1%, telecoms and fibre — 1.1%, electrification — 0.5%; AI building in 2025–2032, by his forecast, averages 3.6% a year, $10.3trn in total 176 M. Torsten Slok, chief economist of Apollo, counts only hyperscalers’ capital expenditure: 0.6% of GDP in 2023, 1.4% in 2025 and, on analyst consensus, about 3% a year in 2027–2029 177 M.

AI building is already no smaller than the fibre boom, and on forecast its average share of GDP (3.6%) will exceed that of the railways (2.2%)
Investment as a percentage of GDP
Sources: Van Nieuwerburgh, Brookings podcast on economic activity (8 October 2026; averages over the boom years, “on a roughly comparable basis”); Odlyzko (Britain, 1847); Apollo (housing, 2005); BEA (telecoms equipment, 2000, equipment only, excluding structures); our calculation from SEC and BEA reports (the big four: all the companies’ capital expenditure, not only on AI and not only in the US). Definitions differ; compare within a group.

The analyst Paul Kedrosky rejects the analogy itself: “this is not railways”, because AI data centres are short-lived assets that need their equipment constantly replaced 178 M. He is right about the servers. Rails served for a century, and fibre in conduits for decades. Of the $37.9bn that Epoch AI estimates a gigawatt of capacity costs, 56% goes on servers, which companies depreciate over 5–6 years (see section 05) 115 M. What may become the cheap raw material after the boom is the buildings, land, utility connections and cooling — about a third of the cost (31%). Networking equipment (another 13%) Epoch classes as IT equipment together with servers, so only that third is long-lived. But even old chips, as the A100 at $1.56 an hour shows, do not become free 107 M.

How many years it took to return to the 2000 peak
Years from the dot-com peak to a new record share price; for Amazon the sources differ (from 7 to 10 years)
Sources: AFP via BizNews (Nasdaq Composite, closing prices); Wikipedia and Motley Fool (Amazon, Microsoft); Morningstar (Cisco). For Amazon, ≈7 years corresponds to the break-even date in autumn 2007 (the blog A Wealth of Common Sense), while according to Wikipedia full recovery came in 2010 (≈10 years). The sources give different depths for the falls; conservative values are used here.

The economist Carlota Perez describes each technological revolution as an installation period — 20–30 years ending in a financial frenzy — followed by a turning point (crash and recession) and a deployment period of another 20–30 years, when the technology pays off across the whole economy 179 M. She regards the excess investment in telecoms as useful: the frenzy left infrastructure that everyone used 179 M. If AI is a new installation phase, the turning point is still ahead; but on Perez’s own scheme the turning point of the ICT revolution falls in 2000–2003 (our reading of her scheme), so AI can also be assigned to the deployment of that same revolution 179 L. The timeline below shows how this played out with earlier networks.

Prehistory: infrastructure booms, 1825–2015
Milestones of railways, the telegraph, electricity, telecoms and the dot-coms; filter at the top
Sources: NBER and FRED, Odlyzko, Federal Reserve Bank of Richmond, SEC, press (see the link beside each milestone).

09 · Forecast2027–2040: will capex exceed $1trn a year, will an answer of fixed quality get another 1,000 times cheaper, and what it means for valuations

2027: more than a trillion

No big company has promised to cut spending in 2027. Alphabet’s chief financial officer said it would “increase significantly” 180 M; Microsoft expects growth in fiscal 2027 24 H; Meta already has $121.4bn of non-cancellable purchase commitments (cloud capacity, servers, networking, energy) payable in 2027, but has not given its own capex figure for 2027 7 H. Forecasts for 2027 range from more than $1.1trn (JPMorgan, hyperscalers) 123 M to $1.3trn (S&P Global Ratings, six companies including SpaceX; as relayed by CryptoBriefing, the original did not open) 181 L. Epoch AI’s mechanical extension of the trend gives $1.19trn for five companies, against operating cash flow of about $0.9trn 28 L. In April 2026, before the July increase in plans, Barclays expected the big four plus Oracle to spend almost 90% of their operating cash flow on capex in 2027 182 M.

Capex forecasts for 2027 range from $1.1trn to $1.3trn
Forecasts of capital expenditure on AI infrastructure in 2027, $ (different lists of companies)
Sources: S&P Global Ratings and Goldman Sachs (via CryptoBriefing, September 2026; originals did not open); Epoch AI (trend, June 2026); JPMorgan (mid-2026 outlook via Fortune); company reports (2026 plan). Forecasts, not facts.

Long-term forecasts only move up. In August 2026 Dell’Oro Group raised its forecast for global data-centre capex (all data centres, not just AI) to more than $3trn a year in 2030, nearly double its January figure; the words “a year” are our reading of the release 183 M. Between January and September 2026 Gartner raised its forecast for global AI spending this year from $2.53trn to $2.7trn 184 L. Forecasters seem to follow company plans rather than test demand, so a forecast is not evidence of payback (our estimate) L.

Will an answer get another 1,000 times cheaper by 2040?

For the price of an answer of fixed quality to fall another 1,000-fold in 14 years, it needs to get cheaper by only 1.64 times a year (our calculation) L. That is far slower than the record so far: Epoch AI measured declines of 9–900 times a year 4 M, and OpenAI’s chief executive, Sam Altman, claims that the cost of a given level of AI falls about tenfold every year 185 L. So a thousandfold fall by 2040 for old quality is, if anything, a cautious scenario. But Epoch itself warns that the fastest decline came in the most recent year and may not be repeated 4 M; a preprint by MIT researchers puts the typical pace at 5–10 times a year 57 M. And hardware gets cheaper by only about 1.4 times a year 56,3 H; over 14 years that is roughly 100–150-fold (our calculation) L. As section 03 shows, the price of flagship models has not fallen on average since 2025: OpenAI’s more than doubled, while Anthropic cut the price of Opus threefold but launched an even dearer tier. So the main question to 2040 is not the price of a token but how many tokens new tasks will need.

More than 3% of GDP

The hypothesis that AI spending will exceed 3% of GDP already has support in forecasts for the United States. According to a consensus cited by Apollo, hyperscalers’ capex will be about 3% of GDP a year in 2027–2029 177 M; Van Nieuwerburgh calculates 3.6% on average over 2025–2032 if data centres, energy and chips are included 176 M. For the world economy to 2040 we found no such forecast from a well-known institution L. For comparison: American railways averaged 2.2% of GDP over some 20 years of boom (1870–1890) 176 M, and British railway investment at the peak of 1847 was about 7% of GDP in Odlyzko’s reconstruction 18 L; an average over several years and the peak of a single year cannot be compared.

Estimates of the effect on the economy vary widely. Bridgewater calculates that AI capex will add 1.4 percentage points to US GDP growth in 2026 and 1.5 in 2027, but warns that a large part of this is the profits of chipmakers, which do not flow back into the economy 186 H. The Nobel laureate Daron Acemoglu estimates the gain in America’s total factor productivity from AI at no more than 0.66% over ten years 187 H; Goldman Sachs in 2023 put it at +7% of global GDP over ten years under a hypothetical scenario 188 M; these are different quantities and cannot be compared directly.

What the builders say

The bosses of the biggest companies admit the risk of oversupply but think that falling behind is worse. In October 2025 Jeff Bezos called AI “more of an industrial bubble than a financial one” that would still bring society enormous benefits 189 M. In November 2025 Sundar Pichai spoke of “elements of irrationality” and said that no company, Google included, would be immune if the bubble burst 190 M. In September 2025 Mark Zuckerberg called an AI bubble “quite possible”: to “misspend a couple of hundred billion dollars” would be regrettable, but he saw slowness as the bigger risk 191 M. In August 2025 Sam Altman said that investors as a whole are overexcited about AI 189 M. By Gartner’s estimate, more than $3.5trn of spending on AI infrastructure could be at risk of write-off by the end of 2030 192 L.

What to check in the reports of 28–29 October

Microsoft reports on 28 October and Amazon on 29 October 193,194 H; Alphabet, according to earnings calendars, also on 28 October 195 L; Meta reported on 21 October. The most important figures: guidance for capex in 2027 (for the four, below the 2026 plan of about $0.74trn would mean a fall; about $0.9trn a sharp slowdown in growth; $1.1–1.3trn, as in forecasts for wider lists of companies, a continuation of the trend); the ratio of capex to operating cash flow; growth of Azure, Google Cloud and AWS; depreciation; backlogs and the share of OpenAI and Anthropic in them. In April 2026 Noah Weisberger of BCA Research suggested that investors might give companies about a year (that is, until spring 2027) to show that spending turns into revenue and cash 182 M.

Our estimate: what is likely by 2030–2040

QuestionWhat, in our estimate, is likelyConfidenceWhat could change the picture
Price of an answer of fixed qualityLikely to keep falling; a further 1,000-fold drop by 2040 is possible, since 1.64 times a year is enoughMediumLimits of smaller models; collusion or consolidation of suppliers
Price of flagship modelsMay not fall, or may rise (OpenAI’s has already risen; Opus got cheaper, but a dearer tier appeared): companies will sell more reasoning and agentic work at a higher priceMediumOpen Chinese models at flagship level; a price war
Demand for computeWill grow at least until 2028; capacity will be short, not in surplusMediumAn efficiency leap without new applications (as with fibre in 1996–2001); recession
Capex of the big four in 2027$1.1–1.3trn in forecasts for various lists of companies (for the four alone, nearer the lower bound); share of operating cash flow from about 90% (Barclays, April, before the increase in plans) to 120–130% (JPMorgan, Epoch trend)MediumGuidance in the reports of 28–29 October; memory prices
PaybackGenerative-AI revenue will probably reach about $300bn a year (the break-even threshold according to Goldman, as relayed by the press) by 2028, but is unlikely to reach $650bn (JPMorgan, a 10% return on current investment) by 2030: at growth of about 30% a year from $175bn in June 2026 it would come to about $500bn (our calculation). Each new year of building raises the barLowThe speed at which agents replace human work in companies
P/E of the big fourCurrent forward P/Es of the four are 18.9–23.5; in the base scenario 15–22 by 2028 (our estimate, no separate source); 10–12 only if profits fall or companies switch to permanent debt financingMediumCorrection of Nvidia and cloud earnings; higher depreciation; interest rates
Companies building on debtAlready compressed (Oracle at 11.5); among neoclouds, debt restructurings are likelyMediumExtension of OpenAI contracts; sale of capacity to hyperscalers
What remains after the boomBuildings, power connections and networks will be cheap raw material for the 2030s; servers only in part, because they become obsolete quicklyMediumPace of new chip generations; the price of electricity
Defence AIA correction would hit valuations in late-stage rounds and the window for stock-market listings; Ukrainian manufacturers would be affected indirectlyLowGovernment orders in the EU and America; the end of the war

10 · LimitsHonesty and limits

The strongest argument that valuations will hold

Bubbles burst when there is too much capacity. Today there is too little: vacancy in the main North American data-centre markets is 1.4% (a share of available electrical capacity, not of empty buildings), GPU rental prices are rising, and Microsoft, Alphabet and TSMC say demand exceeds supply 10,62,24,60,196 M. The labs’ revenue is growing very fast, although Epoch AI notes that the pace is already slowing 88 L. According to the S-1 prospectus, whose full text we could not open, Anthropic raised its quarterly revenue about 59-fold over six quarters (from the fourth quarter of 2024) and had an operating profit of $974m in the second quarter of 2026. But its net loss for the half is $80.7bn, mostly because of a non-operating revaluation of debts, and the company reports revenue on a gross basis 11 M. Anthropic also beat its own revenue forecast: according to Reuters, in October 2025 it planned an annualised revenue run-rate of $20bn for 2026 (best case $26bn), and by May 2026 it announced $47bn 197,198 M. Multiples are moderate: the forward P/E of the S&P 500 equals its ten-year average 15 H. The big four still finance most of the building from their own cash flow (77% over the 12 months to the second quarter of 2026 22 M) rather than from debt, as the telecoms did in the 1990s; but the cushion is thinning: in the second quarter of 2026 the capex of the five companies was 97% of operating cash flow 5 M. If demand continues to exceed supply, the current boom is closer to the British Railway Mania of the 1830s, which, according to Odlyzko, turned out well for investors who held on to their shares, with demand forecasts then accurate 18 M, than to the crash of the 1840s, when demand forecasts were overstated. This is our assumption L.

The strongest argument for compression to 10–12

The Microsoft precedent shows that P/E can fall from 66 (on expected earnings, September 1999) to 12 (on actual earnings, late 2012) even while profit grows 138,139 M. The Shiller CAPE is 40.4, close to the 1999 record 149 M. Earnings are inflated by one-off gains on the revaluation of equity securities: in the second quarter of 2026 these were $98bn at Alphabet and $53.4bn at Amazon, mostly from investments in Anthropic 15 H. Michael Burry adds that earnings may also be inflated by extended useful lives 100 M. Part of the suppliers’ revenue is money they themselves invested in customers: in OpenAI’s March 2026 round Nvidia put in $30bn, and Amazon committed to invest up to $50bn, of which $35bn is conditional 127 M; we have not estimated the share in suppliers’ revenue. If OpenAI misses its plans ($36bn of revenue in 2026 against cumulative negative cash flow of $278bn by 2030 72 L), the backlogs of Oracle, Microsoft and CoreWeave will shrink along with Nvidia’s profit. Hyperscalers would then find themselves in the position of the telecoms of 2002: with an expensive network, debt and slow growth, and a multiple of 8–12 is normal for such an industry.

Limits of this briefing

  • Data before the reports. All figures are as of 26 October 2026. Microsoft (28 October) and Amazon (29 October) report on confirmed dates, Alphabet is expected on 28 October, Nvidia in late November; the base numbers will change. The Epoch AI series ends in the first quarter of 2026; we added the second quarter ourselves from the 10-Q filings.
  • Different definitions of capex. With or without finance leases, gross or net (Amazon), calendar or fiscal year (Microsoft, Oracle). We converted the data to calendar quarters and years (for Oracle in the second quarter of 2026 we took its fiscal quarter of March–May) and used cash purchases of equipment without finance leases, but company guidance for 2026 rests on inconsistent bases: Microsoft’s and Meta’s include leases.
  • OpenAI revenue comes from leaks. OpenAI does not publish accounts; all its figures are leaked accounts (for 2024–2025 they are audited, according to the Financial Times), investor presentations or company statements relayed by the press. The annualised revenue run-rates of the two labs are calculated differently and cannot simply be added together.
  • Multiples are a single snapshot. Companies’ forward P/Es are taken from Finviz on the morning of 26 October (earnings of the next fiscal year, and companies’ fiscal years end in different months), index ones from FactSet for 16 October; other services give other values (for Nvidia from 13.6 to 17.8), because they use different forecast years.
  • Historical comparisons are not harmonised. The shares of GDP in booms were calculated by different authors using different definitions. The sceptic reviewer could not verify Odlyzko’s reconstructions for British railways against the primary source; we give the 1847 figure as “about 7%”.
  • The calculators are simplified models. They do not take account of taxes, pricing, the shift to dearer models, or the fact that some equipment is rented rather than bought. The default values are our assumptions based on sources.
  • Our arithmetic is marked with the confidence label L. Bank forecasts and executives’ statements are not facts.
  • This is analytical material, not investment advice.

11 · QuestionsFrequently asked questions

Has the price of a token really fallen 280-fold?

Yes, but only for a fixed level of quality. According to the Stanford AI Index 2025, a GPT-3.5-level model cost $20 per million tokens in November 2022 and $0.07 in October 2024. Prices of the strongest models behave differently: GPT-5 launched at $1.25 and $10 per million input and output tokens, and GPT-5.5 in April 2026 at $5 and $30. The volume-weighted Silicon Data market index showed $0.95 per million tokens in October 2026.

Could the P/E ratios of AI companies fall to 10–12?

For some companies it has already happened: Oracle's forward P/E is 11.5. For the big four the starting point is not 50–70 but 19–23, and for Nvidia 14–18. A move to 12 with earnings unchanged would mean share-price falls of 36–49%, depending on the company (46% for Microsoft). Historically this happened to Microsoft (66 in 1999, 11.7 in 2012) and Cisco (166 in 2000, 17 in 2010) once growth slowed. We regard 15–22 as the base case for the four, and 10–12 only if earnings fall or construction moves onto permanent debt.

Why don't cheaper tokens reduce the need for data centres?

Because consumption is growing faster than tokens are getting cheaper. In two years Google increased its token processing about 330-fold, to 3.2 quadrillion a month. Reasoning models and agents use 4–15 times more tokens per task than a chat does. Hardware, meanwhile, is getting cheaper by only about 1.4 times a year. Vacancy in North American data centres is 1.4%, and H100 rental prices per GPU-hour have risen: by 38% on annual contracts (October 2025 to March 2026) and by 44% on the Silicon Data index (December 2025 to October 2026).

Who is financing the build-out if cash flow falls short?

Increasingly, debt and share sales. In 2025 Amazon, Alphabet, Meta, Microsoft and Oracle sold $121bn of bonds, against $28bn a year in 2020–24; in 2026 up to September the figure was more than $180bn, including SpaceX. Alphabet raised $49.6bn by issuing shares. Separately, six companies have signed data-centre leases that have not yet commenced: about $1.23trn of undiscounted payments over several years (our calculation from various dates in 2026; the figures for Oracle and CoreWeave have not been verified). JPMorgan expects debt to finance $4.1trn of the $5.5trn of AI capital expenditure to 2030.

What will happen to this infrastructure if the boom ends?

The experience of railways and fibre shows that investors lose while the networks remain and become cheaper for the next users. After the telecoms boom the price of data transmission fell from $1,200 (1998) to $0.08 (2026) per Mbit/s a month; YouTube and Netflix appeared when IP transit was getting cheaper fast (the causal link is our assumption). But in AI more than half of a data centre's cost is servers, which companies depreciate over 5–6 years (critics say 2–3). The cheap raw material may be, above all, buildings, grid connections and networks; old chips will also get cheaper, but will not become free.

12 · MoreFurther reading

13 · SourcesSources and method

Each number in the text leads to its source. Labels: H — primary source (company filings with the SEC, official statistics, a peer-reviewed paper), M — secondary source or one checked against several, L — an estimate, a forecast, a statement by a company or official, a single unconfirmed source or our calculation. The data were gathered by 9 research agents using search; another 9 sceptic agents independently checked 228 entries with key numbers and dates (against primary sources where they could be opened): 170 confirmed, 30 corrected, 27 could not be verified, 1 refuted. We removed what was refuted and fixed what was corrected; what could not be checked against a primary source (including part of the data from Anthropic’s S-1, whose full text did not open) rests on secondary sources. Capex and cash flows are taken from 10-K and 10-Q filings via the SEC database (Epoch AI series from its tables); quarters are converted to calendar ones, and for Oracle the nearest fiscal quarter (March–May) is used; 2026 guidance comes from company earnings calls and releases. All sums are in US dollars unless stated otherwise. Data as of 26 October 2026.

  1. Alphabet — Form 8-K, Ex. 99.1, Q2 2026 results, 22 July 2026. sec.gov H
  2. Alphabet — Form 10-Q, Q2 2026. sec.gov H
  3. Stanford HAI — The 2025 AI Index Report, top takeaways page. hai.stanford.edu H
  4. Epoch AI — LLM inference price trends, 12 March 2025. epoch.ai M
  5. Epoch AI — Hyperscaler capex vs. cash flow (own sums of SEC filings match its five-company total). epoch.ai M
  6. Platformonomics — Follow the capex: Q2 2026 scoreboard, July 2026. platformonomics.com M
  7. Meta — Form 10-Q, Q3 2026 (own sum of 10-K and 10-Q disclosures). sec.gov L
  8. Google — Sundar Pichai's I/O 2025 keynote remarks. blog.google H
  9. Google — Sundar Pichai's I/O 2026 post, 19 May 2026. blog.google H
  10. CBRE — press release on North America data centre trends, H1 2026. cbre.com H
  11. Anthropic, PBC — Form S-1, summary consolidated financial data, 26 October 2026. sec.gov H
  12. ValueAdd VC — OpenAI revenue in 2026 and the path to profitability (citing the Wall Street Journal, 18 August 2026). valueaddvc.com M
  13. Finviz — valuation screener of AI-related companies (delayed quotes), 26 October 2026. finviz.com M
  14. StockAnalysis.com — NVIDIA stock statistics, as of 26 October 2026. stockanalysis.com M
  15. FactSet — Earnings Insight, 16 October 2026. advantage.factset.com H
  16. StockAnalysis — NVIDIA annual ratios (own arithmetic). stockanalysis.com L
  17. Finviz — valuation screener of comparison companies (delayed quotes), 26 October 2026. finviz.com M
  18. Andrew Odlyzko — Collective hallucinations and inefficient markets: The British Railway Mania of the 1840s (expanded version). www-users.cse.umn.edu M
  19. DrPeering.net — Internet Transit Prices, Table 2-2. drpeering.net L
  20. TeleGeography — IP Transit Pricing in 2026: More Competition, More Price Erosion, 16 September 2026. resources.telegeography.com M
  21. Tiger Brokers (Deep News) — Oracle's worst week since the 2001 dot-com crash amid AI financing concerns, 27 June 2026. itiger.com M
  22. SEC EDGAR — Microsoft XBRL company facts (own sums of company filings). data.sec.gov M
  23. Microsoft — FY26 Q3 earnings call transcript (CFO Amy Hood). microsoft.com H
  24. Microsoft — FY26 Q4 earnings call transcript (CFO Amy Hood). microsoft.com H
  25. Meta — Form 10-K, FY2024 and FY2025. sec.gov H
  26. TrendForce — 4Q26 memory price forecast, 24 September 2026. trendforce.com H
  27. TrendForce — DRAM Market Bulletin, 21 October 2026 (public summary). trendforce.com H
  28. Epoch AI — Hyperscaler capex vs. cash flow chart data (CSV trend columns; own arithmetic). epoch.ai M
  29. Oracle — Form 10-K, fiscal 2026. sec.gov H
  30. Amazon — Form 10-Q, Q2 2026. sec.gov H
  31. Meta — Form 8-K, Ex. 99.1, Q3 2026 results, filed 21 October 2026. sec.gov H
  32. Microsoft — Form 10-K, FY2026 (own arithmetic on 10-K and 10-Q data). sec.gov M
  33. SEC EDGAR — XBRL data for AT&T, Union Pacific and Verizon (own ratios). data.sec.gov M
  34. FRED — US nominal GDP, annual (own ratio to capex from SEC filings). fred.stlouisfed.org M
  35. FRED — US nominal GDP, series GDP (own arithmetic: guidance midpoints over H1 2026 GDP). fred.stlouisfed.org L
  36. FRED (BEA) — fixed investment in information processing equipment and software; GDP at 30 September 2026 (own ratio). fred.stlouisfed.org M
  37. ING Think — how much AI is contributing to US economic growth (citing Jason Furman). think.ing.com M
  38. The Wealth Advisor — AI added basically zero US economic growth last year, Goldman says (Washington Post), 24 February 2026. thewealthadvisor.com M
  39. FRED (BEA) — contribution of information processing equipment to real GDP change (Y034RY2Q224SBEA), updated 30 September 2026. fred.stlouisfed.org H
  40. Evertiq — AI boom pushes hyperscaler capex towards $830bn in 2026 (citing TrendForce), 6 May 2026. evertiq.com M
  41. a16z — LLMflation: LLM inference cost is going down fast. a16z.com M
  42. OpenAI — API pricing page and API changelog. developers.openai.com H
  43. Anthropic — Claude API pricing page and Claude Developer Platform release notes, 24 November 2025 and 5 January 2026. platform.claude.com H
  44. BenchLM.ai — LLM Pricing Statistics (2026). benchlm.ai L
  45. InfoWorld — AI token prices are cooling – but why? (citing Bloomberg), 3 July 2026. infoworld.com M
  46. Silicon Data — LLM Token Expenditure Index, index page. silicondata.com M
  47. FinanzaOnline — Italian market note (not opened); CNBC/Quartz via search-result summaries. finanzaonline.com L
  48. AI Weekly — Silicon Data token index drops 20% from May (summary of Bloomberg), 3 July 2026. aiweekly.co M
  49. The Decoder — OpenAI CEO Sam Altman weighs in on DeepSeek's market impact, 27–28 January 2025. the-decoder.com M
  50. Google — Sundar Pichai's remarks on Alphabet's Q3 2025 earnings call. blog.google H
  51. Google — Sundar Pichai's remarks on Alphabet's Q2 2026 earnings call (plus MarketBeat call highlights). blog.google H
  52. Microsoft — FY25 Q3 earnings conference call transcript. cdn-dynmedia-1.microsoft.com H
  53. OpenRouter and a16z — State of AI study, sections 3–5 (arXiv 2601.10088). arxiv.org M
  54. Anthropic Engineering — How we built our multi-agent research system, 13 June 2025. anthropic.com H
  55. Menlo Ventures — 2025 State of Generative AI in the Enterprise; Mid-Year LLM Market Update. menlovc.com M
  56. Epoch AI — Trends in Machine Learning Hardware, 9 November 2023. epoch.ai H
  57. arXiv — The Price of Progress: Price Performance and the Future of AI (2511.23455), v2, 23 March 2026. arxiv.org M
  58. Google — Sundar Pichai's remarks on Alphabet's Q4 2025 and Q1 2026 earnings calls. blog.google M
  59. NVIDIA — press release: NVIDIA Kicks Off the Next Generation of AI With Rubin, 5 January 2026. nvidianews.nvidia.com L
  60. Futuriom — Google raises capex, Wall Street sells (on Alphabet's Q2 2026 results), July 2026. futuriom.com M
  61. SemiAnalysis — The Great GPU Shortage – Rental Capacity, 2 April 2026. newsletter.semianalysis.com M
  62. Silicon Data — H100 index page and blog post, 9 January 2026. silicondata.com M
  63. Sherwood News — Microsoft cancels 2 gigawatts' worth of data centres, analysts say (citing TD Cowen notes). sherwood.news M
  64. Microsoft — Form 10-K, FY2026. sec.gov H
  65. HPCwire — report: China's race to build AI datacentres has hit a wall (citing Chinese media), 28 March 2025. hpcwire.com L
  66. Business Standard — DeepSeek sparks AI stock sell-off, Nvidia loses record $593bn in market cap (Reuters/LSEG). business-standard.com M
  67. SemiAnalysis — DeepSeek Debates, 31 January 2025 (paywalled after the introduction). newsletter.semianalysis.com M
  68. Sherwood News — Nvidia has almost recovered all of its DeepSeek losses. sherwood.news M
  69. Bloomberg Government — OpenAI's annualised revenue nears $50bn (citing the Financial Times), 8 October 2026. news.bgov.com M
  70. Techstrong.ai — OpenAI's revenue outpaced by the scale of its losses ahead of IPO (checked by Financial Times), 17 June 2026. techstrong.ai M
  71. TechCrunch — ChatGPT reaches 900M weekly active users (quoting an OpenAI blog post), 27 February 2026. techcrunch.com M
  72. Let's Data Science — OpenAI forecasts $278bn cash burn through 2030 (via Reuters, FT, Bloomberg Law), 20 September 2026. letsdatascience.com L
  73. Bloomberg Government — Anthropic revenue run rate surpasses $65bn ahead of IPO (Bloomberg report), 18 August 2026. news.bgov.com M
  74. Anthropic — expanded partnership with Google and Broadcom, 6 April 2026. anthropic.com H
  75. Microsoft — FY26 Q3 earnings release (CEO statement). microsoft.com H
  76. Microsoft — FY26 Q4 earnings release, 29 July 2026. microsoft.com H
  77. Oracle — Form 10-Q, Q1 FY2027. sec.gov H
  78. CoreWeave — Q2 2026 results press release. investors.coreweave.com H
  79. PPC Land — S&P cuts Oracle to BBB as AI buildout widens cash deficit to $42bn (citing S&P Global Ratings), July 2026. ppc.land M
  80. NVIDIA — Form 10-Q, Q2 FY2027. sec.gov H
  81. Sequoia Capital — AI's $200B Question. sequoiacap.com M
  82. Sequoia Capital — AI's $600B Question, 20 June 2024. sequoiacap.com M
  83. TechCrunch — Can AI answer the $3 trillion question?, 9 July 2026. techcrunch.com L
  84. Bain & Company — press release for the 6th Global Technology Report: $2tn in new revenue needed to fund AI's scaling. bain.com M
  85. Bain & Company — press release for the 7th Global Technology Report: global AI market could hit $6tn annually by 2031. bain.com M
  86. J.P. Morgan Asset Management — How is AI being monetized (citing JPM Research), 9 January 2026. am.jpmorgan.com M
  87. CryptoBriefing — summary of a Goldman Sachs research note on hyperscaler capex and AI revenue, 25 September 2026. cryptobriefing.com L
  88. Epoch AI — Gradient Updates, An update on AI's most important number, 27 August 2026. epoch.ai L
  89. MIT Project NANDA — The GenAI Divide: State of AI in Business 2025 (PDF mirror on mlq.ai). mlq.ai M
  90. arnon.dk — MIT's 95% AI failure rate is wrong, 27 August 2025. arnon.dk L
  91. McKinsey QuantumBlack — The state of AI in 2026, August 2026 (as seen in a search-result summary). mckinsey.com M
  92. US Census Bureau — Business Trends and Outlook Survey (BTOS), national response estimates. census.gov H
  93. Microsoft — Form 10-K, FY2021, Note 1. sec.gov H
  94. Microsoft — Form 10-K, FY2023, Note 1. sec.gov H
  95. Alphabet — Form 10-K, FY2023, Note 1. sec.gov H
  96. Meta — Form 10-K, FY2025, critical estimates. sec.gov H
  97. Oracle — Form 10-K, fiscal 2025, Note 1. sec.gov H
  98. CoreWeave — Form 10-K, FY2025, Note 2. sec.gov H
  99. Amazon — Form 10-K, FY2025, Note 1. sec.gov H
  100. Albany Advertiser (CNBC syndication) — Michael Burry accuses AI hyperscalers of boosting earnings artificially, 12 November 2025. albanyadvertiser.com.au M
  101. Dave Friedman's Substack — The $176 Billion Accounting Question. davefriedman.substack.com L
  102. Footnote Brief — The $200 Billion Question Hiding in Big Tech's AI Spending. footnotebrief.com L
  103. Silicon UK — Nvidia refutes criticism in memo to analysts (memo published by Bernstein), 28 November 2025. silicon.co.uk M
  104. The Motley Fool — Nvidia Q3 FY2026 earnings call transcript, 19 November 2025. fool.com M
  105. Sherwood News — Microsoft just delivered a big blow to Michael Burry's AI bear case, 29 January 2026. sherwood.news M
  106. Jon Peddie Research — Nvidia GTC 2026 keynote, 16 March 2026. jonpeddie.com M
  107. Silicon Data — A100 index page. silicondata.com M
  108. Silicon Data — blog post: H100 rental price over time, 21 December 2025. silicondata.com M
  109. AWS News Blog — Announcing up to 45% price reduction for Amazon EC2 NVIDIA GPU-accelerated instances. aws.amazon.com H
  110. Ornn — Compute Price Index OCPI-H100 (Bloomberg: ORNNH100). data.ornn.com M
  111. Latent Space — GPU bubble. latent.space L
  112. Yahoo Finance (Investing.com) — Oracle stock falls as report reveals thin AI cloud margins (The Information), 7 October 2025. finance.yahoo.com M
  113. Longbridge — Oracle financial analyst meeting (relaying Wallstreetcn), 17 October 2025. longbridge.com M
  114. CoreWeave — Q2 2026 earnings release (SEC filing), 11 August 2026. sec.gov H
  115. Epoch AI — AI datacenter cost breakdown, 14 May 2026. epoch.ai M
  116. Investing.com — How much does a GW of data centre capacity actually cost (citing Bernstein), 1 November 2025. investing.com M
  117. TIKR — summary of the BG2 podcast with Jensen Huang (page last updated 19 October 2026). tikr.com M
  118. Yahoo Finance (Reuters) — AI hyperscalers will drive higher US corporate bond supply in 2026 (BofA Securities), January 2026. finance.yahoo.com M
  119. Twenty Four Asset Management — How hyperscaler issuance is reshaping the Treasury curve, 3 September 2026. twentyfouram.com M
  120. IFR (Refinitiv) — The Meta/Blue Owl deal broken down: off-balance-sheet gymnastics 24 years after Enron. ifre.com M
  121. Business Day (Reuters) — AI credit fears push tech default insurance to record highs, 15 October 2026. businessday.co.za M
  122. Morgan Stanley Research — Bridging the $1.5tr Data Center Financing Gap, July 2025 (as summarised in search results). prod-mssip.morganstanley.com M
  123. Fortune — What bubble? JPMorgan's $5.5tn AI capex explosion is profitable for now (JPMorgan Global Research), 25 June 2026. fortune.com M
  124. Resultsense — IMF on an AI share correction and global stability (citing the Guardian and the GFSR), 13 October 2026. resultsense.com M
  125. PYMNTS — Nvidia to invest up to $100bn in OpenAI, setting private funding record, September 2025. pymnts.com M
  126. The Decoder — Nvidia reportedly investing $20bn in OpenAI, one step at a time (WSJ, Bloomberg, CNA), 4 February 2026. the-decoder.com M
  127. Bloomberg Law — OpenAI valued at $852bn after closing $122bn round, March 2026. news.bloomberglaw.com M
  128. Newsweek — Stupid loan bubble. newsweek.com M
  129. Yahoo Finance (GuruFocus) — AI debt selloff deepens as OpenAI misses targets, $4.54bn deal in focus, 28 April 2026. finance.yahoo.com M
  130. Computing — AI bubble heading for market correction, warns Bank of England, October 2025. computing.co.uk M
  131. Crunchbase News — Sector Snapshot: defense startup funding hits an all-time record as VCs begin to eye exits, 2 June 2026. news.crunchbase.com M
  132. Multiples.vc — private comps page for Anduril (revenue via Washington Technology, quoted by Autobound). multiples.vc M
  133. Dealroom — The State of Defence Tech 2026 (chart text). dealroom.co M
  134. AI Weekly — summary of the PitchBook-NVCA Venture Monitor on US venture, H1 2026, July 2026. aiweekly.co M
  135. Kyiv Post — Ukrainian drone AI developer Swarmer files for Nasdaq IPO (quoting Brave1 data), 4 February 2026. kyivpost.com M
  136. Resilience Media — The perfect swarm, 20 March 2026 (IPO filing covered by Kyiv Post, 4 February 2026). resiliencemedia.co M
  137. NVIDIA — press release: financial results for Q2 fiscal 2027, 26 August 2026. nvidianews.nvidia.com H
  138. Microsoft — Form S-4 (Visio merger), filed 2 November 1999; Morgan Stanley fairness analysis. sec.gov H
  139. CompaniesMarketCap — Microsoft P/E ratio history. companiesmarketcap.com M
  140. Boston Partners — Entry Points | Valuation Discipline, Risk and Pricing, January 2023. bostonpartners.com M
  141. Fortune — Microsoft earnings, cloud and share price, 21 October 2016. fortune.com M
  142. The Motley Fool — Cisco still alive and kicking (Capital IQ table), 12 July 2011. fool.com M
  143. Tiger Brokers (Deep News) — Cisco surpasses dot-com bubble peak after 25-year recovery, 11 December 2025. itiger.com M
  144. Wikipedia — Nifty Fifty (citing Jeremy Siegel). en.wikipedia.org M
  145. SEC — speech by Commissioner Richard B. McEntire to NARUC, 17 July 1947. sec.gov H
  146. LPL Research — Weekly Market Commentary, 27 July 2026. sswp.lpl.com M
  147. J.P. Morgan Asset Management — Eye on the Market: Califoreboding, 8 October 2026. cdn.jpmorganfunds.com M
  148. The Motley Fool — Should investors be worried that the Magnificent Seven make up 35% of the S&P 500?, 5 January 2026. fool.com M
  149. multpl.com — Shiller PE ratio. multpl.com M
  150. CryptoBriefing — report on the BofA Fund Manager Survey (FMS), released 13 October 2026. cryptobriefing.com M
  151. FRED (NBER Macrohistory) — mileage of new railway lines authorised by Parliament, Great Britain (A0284DGBA374NNBR). fred.stlouisfed.org H
  152. Wikipedia — Railway Mania. en.wikipedia.org M
  153. NY Fed, Liberty Street — Crisis Chronicles: Railway Mania, the Hungry Forties, and the Commercial Crisis of 1847, 5 June 2015. libertystreeteconomics.newyorkfed.org M
  154. FRED (NBER Macrohistory) — increases in length of railway line opened for traffic, Great Britain (A0285AGBA374NNBR). fred.stlouisfed.org H
  155. FRED (NBER Macrohistory) — increases in railroad mileage, United States (A02082USA374NNBR). fred.stlouisfed.org H
  156. Wikipedia — Panic of 1873. en.wikipedia.org M
  157. Project Gutenberg — Railroad Reorganization (Harvard Economic Studies, vol. IV, Houghton Mifflin, 1908), preface. gutenberg.org M
  158. Bradstreet's — December 1893 issue (scan on DocumentCloud). s3.documentcloud.org M
  159. Cornell LII — US Supreme Court decision, 276 U.S. 104 (context: Transportation Act 1920 and Dayton-Goose Creek). law.cornell.edu M
  160. PBS American Experience — Cable: How the Early Cable Was Used. pbs.org M
  161. FRASER — confidential memo by Lauchlin Currie (Federal Reserve Board) on industrial, railroad and utility capital spending. fraser.stlouisfed.org M
  162. American Heritage — John Steele Gordon, The Fall of Samuel Insull, July/August 1997. americanheritage.com M
  163. EBSCO Research Starters — Number of US automakers falls to forty-four. ebsco.com M
  164. Wikipedia — Dot-com bubble. en.wikipedia.org M
  165. Federal Reserve Bank of Richmond — Boom and Bust in Telecommunications, Economic Quarterly 89/4, Fall 2003. richmondfed.org H
  166. Kerry Coffman and Andrew Odlyzko — Growth of the Internet (2001); Andrew Odlyzko — Internet growth: myth and reality. www-users.cse.umn.edu M
  167. Light Reading — Transatlantic bandwidth: mixed message (citing a TeleGeography report), 25 April 2001. lightreading.com M
  168. Wikipedia — Global Crossing. en.wikipedia.org M
  169. CNN Money — WorldCom files largest bankruptcy ever, 19 July 2002. money.cnn.com M
  170. Wikipedia — List of companies affected by the dot-com bubble. en.wikipedia.org M
  171. John Naughton's blog (memex.naughtons.org) — What if Google...?, 18 August 2005 (quoting Business 2.0). memex.naughtons.org L
  172. Wikipedia — YouTube. en.wikipedia.org M
  173. Wikipedia — Netflix. en.wikipedia.org M
  174. Microwaves & RF — Optical-Telecommunications Gear Recovers From Dot-Com Bust (quoting iSuppli), 14 October 2010. mwrf.com L
  175. NBER — William Nordhaus, Schumpeterian Profits in the American Economy, Working Paper 10433, April 2004. nber.org M
  176. Brookings — podcast: The $10 trillion question: Financing the AI buildout, with Stijn Van Nieuwerburgh, 8 October 2026. brookings.edu M
  177. Apollo — Torsten Slok, The AI Capex Boom Is Building Twice as Fast as the Housing Boom, The Daily Spark, 6 August 2026. apollo.com M
  178. Simon Willison's Weblog — Paul Kedrosky quoted, Honey, AI Capex is Eating the Economy, 19 July 2025. simonwillison.net M
  179. strategy+business — Art Kleiner, Carlota Perez: The Thought Leader Interview, 29 November 2005. strategy-business.com M
  180. MarketBeat — Alphabet Q2 2026 earnings call highlights, 22 July 2026. marketbeat.com M
  181. CryptoBriefing — AI hyperscalers' trillion-dollar spending gamble (citing S&P Global Ratings). cryptobriefing.com L
  182. Benefits and Pensions Monitor — can hyperscalers turn steel and silicon into steady cash? (citing Barclays), 30 April 2026. benefitsandpensionsmonitor.com M
  183. Dell'Oro Group — press release: data centre capex to surpass $3tn by 2030, 18 August 2026. delloro.com M
  184. Gartner — press releases on worldwide AI spending forecasts, 15 January, 19 May and 16 September 2026. gartner.com L
  185. Sam Altman's blog — Three Observations. blog.samaltman.com H
  186. Bridgewater Associates — The Macro Implications of the AI Capex Boom. bridgewater.com H
  187. NBER — Daron Acemoglu, The Simple Macroeconomics of AI, Working Paper 32487, May 2024. nber.org H
  188. Goldman Sachs Insights — Generative AI could raise global GDP by 7%. goldmansachs.com M
  189. IEEE ComSoc Technology Blog — Amazon's Jeff Bezos at Italian Tech Week: AI is a kind of industrial bubble, 4 October 2025. techblog.comsoc.org M
  190. Graphic Online — Google boss warns no company is going to be immune if AI bubble bursts (BBC Technology interview). graphic.com.gh M
  191. Sherwood News — Zuckerberg: AI might be a bubble but misspending a couple of hundred billion is worth it, 19 September 2025. sherwood.news M
  192. Gartner — press release: over $3.5tn of AI infrastructure spending could face impairment by end-2030, 14 October 2026. gartner.com L
  193. Microsoft Investor Relations — event page: FY27 Q1 earnings. microsoft.com H
  194. Amazon Investor Relations — event page: Q3 2026 earnings conference call. ir.aboutamazon.com H
  195. days.to — Alphabet earnings date (calendar aggregator). days.to L
  196. CRN Asia — TSMC third-quarter revenue tops guidance as CEO says AI demand still exceeds supply, 15 October 2026. crnasia.com M
  197. Yahoo Finance (Reuters) — exclusive: Anthropic aims to nearly triple revenue, 15 October 2025. finance.yahoo.com M
  198. Anthropic — Series H announcement, 28 May 2026. anthropic.com H

Read this briefing in Ukrainian →